Bi-criteria group scheduling with sequence-dependent setup time in a flow shop
Autor: | Lu, D, Logendran, R |
---|---|
Zdroj: | The Journal of the Operational Research Society, 2013 Apr 01. 64(4), 530-546. |
Databáze: | JSTOR Journals |
Externí odkaz: |
Autor: | Lu, D, Logendran, R |
---|---|
Zdroj: | The Journal of the Operational Research Society, 2013 Apr 01. 64(4), 530-546. |
Databáze: | JSTOR Journals |
Externí odkaz: |