06/01689 Utilization of time varying event-based customer interruption cost load shedding schemes: Wangdee, W. and Billinton, R. International Journal of Electrical Power & Energy Systems, 2005, 27, (9–10), 674–681
Zdroj: | In Fuel and Energy Abstracts 2006 47(4):259-259 |
---|---|
Databáze: | ScienceDirect |
Externí odkaz: |