The principles of justification of an object construction duration

Autor: Oleinik Pavel, Cherednichenko Nadezhda, Shvedov Stefan, Melnichuk Vitaliy
Jazyk: English<br />French
Rok vydání: 2019
Předmět:
Zdroj: E3S Web of Conferences, Vol 110, p 02126 (2019)
Druh dokumentu: article
ISSN: 2267-1242
DOI: 10.1051/e3sconf/201911002126
Popis: The duration of an object construction is considered as a parameter expressing the concentrated influence of all stages of its formation, including design, preconstruction, construction, etc. It is shown that the construction stage, as the final stage, is the most flexible and its components that include organization of construction, technology and mechanization of construction and installation works promptly implement solutions from all previous stages, consisting of a large number of various methods and ways of influencing the construction duration. These activities allow reducing energy costs and making production less energy intensive. The decisions on combining the work of the preconstruction and the main periods of construction are given as an example.
Databáze: Directory of Open Access Journals