Status of the warm front end of PIP-II injector test
Autor: | Shemyakin, Alexander, Alvarez, Matthew, Andrews, Richard, Baffes, Curtis, Carneiro, Jean-Paul, Chen, Alex, Derwent, Paul, Edelen, Jonathan, Frolov, Daniil, Hanna, Bruce, Prost, Lionel, Saewert, Gregory, Saini, Arun, Scarpine, Victor, Sista, V. Lalitha, Steimel, Jim, Sun, Ding, Warner, Arden |
---|---|
Rok vydání: | 2018 |
Předmět: | |
DOI: | 10.48550/arxiv.1803.08940 |
Popis: | The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF linac. To validate the concept of the front-end of such machine, a test accelerator known as PIP-II Injector Test (PIP2IT) is under construction. It includes a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CWRFQ, followed by a Medium Energy Beam Transport (MEBT) that feeds the first of 2 cryomodules increasing the beam energy to about 25 MeV, and a High Energy Beam Transport section (HEBT) that takes the beam to a dump. The ion source, LEBT, RFQ, and initial version of the MEBT have been built, installed, and commissioned. This report presents the overall status of the warm front end. Comment: 4 pp. 8th International Particle Accelerator Conference (IPAC 2017) 14-19 May 2017. Copenhagen, Denmark |
Databáze: | OpenAIRE |
Externí odkaz: |