SRF Devlopment and Cryomodule Production for the FRIB Linac

Autor: Xu, Ting, Ao, Hiroyuki, Bird, Brian, Bultman, Nathan, Burkhardt, Earle, Casagrande, Fabio, Compton, Chris, Crisp, Jenna, Davidson, Kelly, Elliott, Kyle, Facco, Alberto, Ganni, Venkatarao, Ganshyn, Andrei, Gibson, Paul, Hartung, Walter, Hosoyama, Kenji, Ikegami, Masanori, Kelly, Michael, Knudsen, Peter, Laxdal, Robert, Lidia, Steven, Malloch, Ian, Miller, Samuel, Morris, Dan, Ostroumov, Peter, Popielarski, John, Popielarski, Laura, Reaume, Marc, Saito, Kenji, Shen, Guobao, Shuptar, Mark, Stark, Sergey, Wei, Jie, Wenstrom, John, Wiseman, Mark, Xu, Mengxin, Xu, Ying, Yamazaki, Yoshishige, Zheng, Zhihong
Jazyk: angličtina
Rok vydání: 2017
Předmět:
DOI: 10.18429/jacow-napac2016-web3io01
Popis: The Facility for Rare Isotope Beams' heavy ion con-tinuous-wave (CW) linac extends superconducting RF to low beam energy of 500 keV/u. 332 low-beta cavities are housed in 48 cryomodules. Technical development of high performance subsystems including resonator, cou-pler, tuner, mechanical damper, solenoid and magnetic shielding is necessary. In 2015, the first innovatively designed FRIB bottom-up prototype cryomodule was tested meeting all FRIB specifications. In 2016, the first full production cryomodule is constructed and tested. The preproduction and production cryomodule procurements and in-house assembly are progressing according to the project plan.
Proceedings of the North American Particle Accelerator Conf., NAPAC2016, Chicago, IL, USA
Databáze: OpenAIRE