Risk Analysis and Control Strategies for the Assembly of Major Structure Module in AP1000 Nuclear Power Project
Autor: | Xiangnyu Wang, Tiezhu Hu |
---|---|
Rok vydání: | 2017 |
Předmět: |
Construction management
Engineering Process (engineering) business.industry Job safety analysis 020209 energy Pre-construction services 02 engineering and technology Nuclear power Construction engineering Work (electrical) Risk analysis (business) Management system 0202 electrical engineering electronic engineering information engineering Systems engineering business |
Zdroj: | Energy Procedia. 127:187-192 |
ISSN: | 1876-6102 |
Popis: | Modular construction is used as the main construction technique in AP1000 nuclear power construction project. The technique can reduce installation workload in nuclear island, reduce cross operation relative to the traditional construction method, and shorten the construction period. While in the assembly process of large structure modules, there are frequent high risky operations including lifting, scaffolding, intensive welding & cutting, and so on. Accidents can be triggered and project schedule could be delayed if the control for the construction process is not sufficient. In this paper, the CA01 module assembly is taken to study as an example. The potential risks during the construction process of CA01 module are analyzed through Job Hazard Analysis, then the technical and management measures are put forward, which include construction scheme review & approval, safety and technical briefing, personnel training, special tradesman management, management system of mechanical equipment, work permit management on high risk work, construction housekeeping. |
Databáze: | OpenAIRE |
Externí odkaz: |