Integration of Schedule, Cost, Traffic, and Risk into the Determination of Construction Contract Times

Autor: Yangtian Yin, Kunhee Choi, H. David Jeong, Ali Touran
Rok vydání: 2022
Předmět:
Zdroj: Journal of Management in Engineering. 38
ISSN: 1943-5479
0742-597X
DOI: 10.1061/(asce)me.1943-5479.0001089
Databáze: OpenAIRE