Autor: |
Yoonseok Shin, Chang-Yeon Cho, Moon-Young Cho, Jung-Yeol Kim, Seo-Kyung Won |
Rok vydání: |
2011 |
Předmět: |
|
Zdroj: |
Korean Journal of Construction Engineering and Management. 12:120-129 |
ISSN: |
2005-6095 |
DOI: |
10.6106/kjcem.2011.12.6.120 |
Popis: |
An installation of the construction lift has a few limitations by many constrains and these have influences on labor productivity, that can be changed by vertical-transportation management. In the super-tall building construction, a management of construction lift operation is one of the most important factor, but existing methodologies depend on skilled practitioners` experiences. And it is true that the expertise resulted by the experiences does not transfer to the next generation. This study is a part of lifting-management simulation development which aims at the optimal construction lift management. A proposed algorithm is focus on lifting time calculation considering an acceleration capability. This research evaluates the result accuracy using comparative analysis on simulation result and field measuring time. |
Databáze: |
OpenAIRE |
Externí odkaz: |
|