Deep Jet-Grouted Cut-Offs in Riverine Alluvia for Ertan Cofferdams
Autor: | P. Groppo Sembenelli, G. Sembenelli |
---|---|
Rok vydání: | 1999 |
Předmět: | |
Zdroj: | Journal of Geotechnical and Geoenvironmental Engineering. 125:142-153 |
ISSN: | 1943-5606 1090-0241 |
DOI: | 10.1061/(asce)1090-0241(1999)125:2(142) |
Popis: | Constructing the 245-m-high, double curvature concrete arch Ertan Dam required two high cofferdams (the upstream one exceeding 60 m) and the removal of 40 m of alluvium from the riverbed. Full penetration and partial penetration cut-offs were created at Ertan with jet-grouting techniques. Dewatering between the cofferdams and behind the cut-offs was successful and was maintained for more than 2 years against 40–70 m of water heads. This paper describes in detail the design rationale and main features, as well as the construction methods of both cut-offs. The treatment by conventional grouting of the rock below the jet-grouted wall is also outlined. |