Autor: |
Sonato, P., Antoni, V., Bigi, M., Chitarin, G., Luchetta, A., Marcuzzi, D., Pasqualotto, R., Pomaro, N., Serianni, G., Toigo, V., Zaccaria, P., ITER International Team |
Předmět: |
|
Zdroj: |
AIP Conference Proceedings; Feb2013, Vol. 1515 Issue 1, p549-558, 10p, 1 Color Photograph, 15 Diagrams, 1 Chart |
Abstrakt: |
The ITER project requires additional heating by two neutral beam injectors, each accelerating to 1MV a 40A beam of negative deuterons, delivering to the plasma about 17MW up to one hour. As these requirements have never been experimentally met, it was decided to build a test facility, PRIMA (Padova Research on ITER Megavolt Accelerator), in Italy, including a full-size negative ion source, SPIDER, and a prototype of the whole ITER injector, MITICA, aiming to develop the heating injectors to be installed in ITER. The Japan and the India Domestic Agencies participate in the PRIMA enterprise; European laboratories, such as KIT-Karlsruhe, IPP-Garching, CCFE-Culham, CEA-Cadarache and others are also cooperating. In the paper the main requirements are discussed and the design of the main components and systems are described. [ABSTRACT FROM AUTHOR] |
Databáze: |
Complementary Index |
Externí odkaz: |
|