Pilot-scale evaluation of AMP/PZ to capture CO2 from flue gas of an Australian brown coal–fired power station.

Autor: Artanto, Yuli1 iluy033@gmail.com, Jansen, James1, Pearson, Pauline1, Puxty, Graeme2, Cottrell, Aaron2, Meuleman, Erik1 erik.meuleman@csiro.au, Feron, Paul2
Předmět:
Zdroj: International Journal of Greenhouse Gas Control. Jan2014, Vol. 20, p189-195. 7p.
Abstrakt: Highlights: [•] An increase of L/G ratio at constant CO2 lean loading improved CO2 recovery. [•] A reduction of CO2 lean loading at constant L/G ratio improved CO2 recovery. [•] At high CO2 lean loading reboiler heat duty was independent of L/G ratio. [•] CO2 lean loading reduction at constant L/G ratio increased reboiler heat duty. [•] Condenser and sensible heat duty were the main contributors to reboiler heat duty. [ABSTRACT FROM AUTHOR]
Databáze: GreenFILE