Zobrazeno 1 - 10
of 411
pro vyhledávání: '"time planning"'
Publikováno v:
Physical Culture and Sport: Studies and Research, Vol 102, Iss 1, Pp 58-69 (2023)
Individual time management skills and a business approach are two fundamental abilities required for success in any life. The goal of this study is to look at the connection between the individual time management skills and business attitudes of spor
Externí odkaz:
https://doaj.org/article/0f5bbf44ce3448139fd5b203118b0200
Publikováno v:
Energy Reports, Vol 9, Iss , Pp 784-791 (2023)
Aiming at the problem that the traditional path planning algorithm does not have real-time planning performance in the dynamic and complex power equipment maintenance environment, or it is challenging to avoid dynamic obstacle obstacles due to poor r
Externí odkaz:
https://doaj.org/article/f2567a8fe03647bf940ca944b39f2abd
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Autor:
Kozlovská Mária, Kempecova Daria
Publikováno v:
Selected Scientific Papers: Journal of Civil Engineering, Vol 18, Iss 1 (2023)
This article aims to analyze productivity issues during the implementation of plastering works on the case study of a residential complex. The results of the study revealed that establishing a proper work schedule and adhering to the Takt schedule re
Externí odkaz:
https://doaj.org/article/b933d0215d304e429a0523dccad41f90
Autor:
Fawcett, Randall Tyler
The aim of this dissertation is to systematically construct a hierarchical framework that allows for robust multi-agent collaborative legged locomotion. More specifically, this work provides a detailed derivation of a torque controller that is theore
Externí odkaz:
http://hdl.handle.net/10919/115783
Autor:
Francisco Burillo, María-Pilar Lambán, Jesús-Antonio Royo, Paula Morella, Juan-Carlos Sánchez
Publikováno v:
Applied Sciences, Vol 14, Iss 5, p 1890 (2024)
In real-time production planning, there are exceptional events that can cause problems and deviations in the production schedule. These circumstances can be solved with real-time production planning, which is able to quickly reschedule the operations
Externí odkaz:
https://doaj.org/article/71dbd255921d4c218fc7b8c503c9daa5
Publikováno v:
Buildings, Vol 14, Iss 2, p 553 (2024)
The complexity and uncertainty of construction projects contribute to low efficiency in the construction industry. This research applied the Takt-time planning method to optimize the construction working process, and proposed a risk control framework
Externí odkaz:
https://doaj.org/article/095b5ccf54d5439dbbaaaa8de05758d5
Autor:
Paulina Kostrzewa-Demczuk
Publikováno v:
Applied Sciences, Vol 14, Iss 1, p 196 (2023)
The organization and planning of construction works are difficult issues due to the complexity, numerous limitations, uncertainty and risks associated with them. Construction planning is usually based on deterministic data. However, numerous studies
Externí odkaz:
https://doaj.org/article/252fcd99fd714fc1ad5fc676e76aa9f0
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Autor:
Meng Wang, Feng Shi, Zhigang Zhou, Yao Cui, Kepu Du, Shuai Li, Tingting Liu, Yanlin Chen, Yadan Li, Fei Gao
Publikováno v:
Journal of Contemporary Brachytherapy, Vol 14, Iss 1, Pp 35-42 (2022)
Externí odkaz:
https://doaj.org/article/f88aa0d963344305bed76e4ac5fbddff