Publikováno v:
Journal of Civil Engineering and Management, Vol 25, Iss 4 (2019)
Time-cost problems that arise in repetitive construction projects are commonly encountered in project scheduling. Numerous time-cost trade-off approaches, such as mathematical, metaheuristic, and evolutionary methods, have been extensively studied in
Externí odkaz:
https://doaj.org/article/4ba8050108154261a5a5fcba19ae9de5
[EN] Earned value management (EVM) is a classical project monitoring technique that is widely used in construction projects. Due to its simplicity, this technique suffers from limitations due to its discrete nature ¿ activity durations, costs, and p
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::2016ff981f1bdc9b209cfa66f8ca1e0b
https://doi.org/10.1016/j.autcon.2022.104583
https://doi.org/10.1016/j.autcon.2022.104583
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Autor:
Serpa, Nilo
This article presents a theoretical model that establishes a framework to describe natural time machines in certain particular circumstances. Time machines are viewed as resulting from deformations of the spacetime itself, being such deformations ori
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::04ca411d74663d2ae00d07fbe27b35c5
Publikováno v:
Journal of Civil Engineering and Management; Vol 25 No 4 (2019); 322-339
Journal of Civil Engineering and Management, Vol 25, Iss 4 (2019)
Journal of Civil Engineering and Management, Vol 25, Iss 4 (2019)
Time-cost problems that arise in repetitive construction projects are commonly encountered in project scheduling. Numerous time-cost trade-off approaches, such as mathematical, metaheuristic, and evolutionary methods, have been extensively studied in
Autor:
Gunnar Lucko, Yi Su
Publikováno v:
Organization, technology & management in construction : an international journal
Volume 7
Issue 2
Volume 7
Issue 2
Line-of-Balance (LOB) is a useful analytical tool for repetitive activities in construction projects, which allows showing which crew is assigned to what repetitive work unit of an activity. LOB is closely related to the linear scheduling method, but
Autor:
Gunnar Lucko, Yi Su
Publikováno v:
Procedia Engineering. 85:339-350
Construction managers plan and control quantitative measures for successful projects. Current techniques for time, budget, and resources are compartmentalized, but should be integrated into a cohesive model. The methodology adapts singularity functio