Zobrazeno 1 - 10
of 5 568
pro vyhledávání: '"project scheduling"'
Publikováno v:
Archives of Civil Engineering, Vol vol. 70, Iss No 3, Pp 607-618 (2024)
Offsite construction technologies are developed to reduce project cost and duration. To make the most of the potential offered by prefabrication the planner should consider the whole supply chain. A failure to coordinate the off-site production with
Externí odkaz:
https://doaj.org/article/5ce4653cb10e45c79d6435987b40b85f
Publikováno v:
Engineering Management in Production and Services, Vol 16, Iss 3, Pp 41-55 (2024)
Elaborating and applying a new model for estimating the time buffer size of a project programme, which shall guarantee a 90 % probability of timely project execution. The research included source text analysis to provide information on a research gap
Externí odkaz:
https://doaj.org/article/882bf0eff8404b4591de4e62fcb699c5
Publikováno v:
Engineering, Construction and Architectural Management, 2023, Vol. 31, Issue 7, pp. 2852-2877.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/ECAM-04-2022-0345
Publikováno v:
Journal of Modelling in Management, 2024, Vol. 19, Issue 4, pp. 1136-1154.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/JM2-06-2023-0123
Publikováno v:
Scientific Reports, Vol 14, Iss 1, Pp 1-23 (2024)
Abstract Quantum annealing emerges as a promising approach for tackling complex scheduling problems such as the resource-constrained project scheduling problem (RCPSP). This study represents the first application of quantum annealing to solve the RCP
Externí odkaz:
https://doaj.org/article/a78a011db6b5499b87f086b947e7daf6
Autor:
Adde Currie Siregar, Noorkhayati Noorkhayati, Santi Yatnikasari, Dasa Aprisandi, Fitriyati Agustina
Publikováno v:
Teknika, Vol 20, Iss 1, Pp 124-131 (2024)
Jalan Pemuda 1 is one of the city roads located in the Samarinda region that often experiences flooding. Therefore, the construction of adequate drainage is necessary to address this flood issue. The construction of this drainage system is expected t
Externí odkaz:
https://doaj.org/article/0311f157f965461f97aa04e8a4a78a28
Publikováno v:
International Journal of Industrial Engineering and Production Research, Vol 35, Iss 2, Pp 87-104 (2024)
Abstract. One of the important problems in managing construction projects is selecting the best alternative for activities' execution to minimize the project's total cost and time. However, uncertain factors often have negative effects on activity du
Externí odkaz:
https://doaj.org/article/1e57565dfc2f4cf9b2af23d6ba798030
Publikováno v:
Journal of Agricultural Machinery, Vol 14, Iss 2, Pp 215-234 (2024)
IntroductionAgricultural production involves a series of tasks including tillage, planting, and harvesting, which must be done at the right time for each region and type of product. Failing to complete these tasks on time can lead to a decrease in yi
Externí odkaz:
https://doaj.org/article/030db5af1ae140e7870999a485597ea3
Publikováno v:
Production and Manufacturing Research: An Open Access Journal, Vol 12, Iss 1 (2024)
ABSTRACTA Systematic Literature Review (SLR) on the Resource-Constrained Multi-Project Scheduling Problem (RCMPSP), Uncertainty, and Resource Flexibility (human resource) is presented in this study. The main purpose is to help scholars with an overvi
Externí odkaz:
https://doaj.org/article/25ae893d0ca6470caff69431190ce2c4