Tole Sutikno, Syahid Hikmatul Wahid, Rizky Ajie Aprilianto, Arsyad Cahya Subrata, Auzani Jidin
Publikováno v:
Jurnal Nasional Teknik Elektro, Vol 11, Iss 1, Pp 1-7 (2022)
PLTH Bayu Baru is one of the hybrid power plants (HPP) located in Baru beach, Pandansimo, Bantul, Yogyakarta, Indonesia. It generates electrical energy from two sources, wind and solar energy. However, a problem is encountered regarding wind turbine
Externí odkaz:
https://doaj.org/article/457d1fe2fe7249f2bf99adde471384b6
Autor:
Derajad S. Widhyharto
Publikováno v:
Jurnal Pengabdian Kepada Masyarakat (Indonesian Journal of Community Engagement), Vol 1, Iss 1, Pp 156-171 (2015)
Limitations and scarcity of natural energy resources has forced the government to develop new renewable energy, one of them by making a pilot hybrid power plant project or Pembangkit Listrik Tenaga Hybrid (PLTH) in coast Pantai Baru, Pandansimo, Bant
Externí odkaz:
https://doaj.org/article/d91494efa843460d9cac2fc58cfd05b6
Publikováno v:
Journal of Electrical Engineering and Computer, Vol 6, Iss 2, Pp 427-436 (2024)
Pemanfaatan sumber energi terbarukan menjadi solusi penting untuk menghadapi permasalahan energi di masa depan. Energi terbarukan, seperti energi matahari dan tenaga air, menawarkan sumber energi yang ramah lingkungan dan berlimpah. Penelitian ini be
Externí odkaz:
https://doaj.org/article/69cd0eb077fe498c93dfd2c2c8f6077c
Publikováno v:
Jurnal MIPA; Vol 8, No 1 (2019); 7-12
Telah dilakukan penelitian tentang sistem pembangkit listrik tenaga hybrid menggunakan Software HOMER ( Hybrid Optimization Model For Electric Renewables ). Tujuan dari penelitian ini untuk optimasi pembangkit listrik tenaga hybrid di Pulau Bunaken y
Production lead-time hedging and coordination in prefabricated construction supply chain management.
Autor:
Zhai, Yue1 (AUTHOR), Zhong, Ray Y.2 (AUTHOR), Li, Zhi3 (AUTHOR), Huang, George1 (AUTHOR) gqhuang@hku.hk
Publikováno v:
International Journal of Production Research. Jul2017, Vol. 55 Issue 14, p3984-4002. 19p. 1 Chart, 3 Graphs.
Identifikasi Potensi Pembangkit Listrik Tenaga Hybrid (PLTH) Angin dan Surya di Kabupaten Aceh Besar
Autor:
Ichsan Syahputra, Fadhli Fadhli
Publikováno v:
Jurnal Teknik Sipil Unaya. 5:39-47
The Wind and Solar Hybrid Power Plant (PLTH) research is expected to be able to contribute to assist the development of electricity supply in Aceh and gradually reduce and substitute the use of fossil energy. Hybrid Power Plant (PLTH) by combining wi
Publikováno v:
ELECTRA : Electrical Engineering Articles. 2:16
Indeks keandalan sistem tenaga listrik dikatakan baik atau handal yaitu ketika sistem tenaga listrik dapat menjamin ketersedian energi listrik bagi konsumen. Faktor yang menentukan tingkat keandalan sistem tenaga listrik salah satunya adalah nilai da
Autor:
Ilham Akbar, Maula Sukmawidjaja
Publikováno v:
Jetri : Jurnal Ilmiah Teknik Elektro. :17-42
Currently electrification on Penyengat Island supplied by Diesel Power Plants with total capacity 285 kW to serve peak load system about 250 kW. This research aims to improve the efficiency of Fuel consumption, by means of implementing a Hybrid Power
Publikováno v:
Jurnal Elkomika, Vol 11, Iss 3 (2023)
ABSTRAK Pada penelitian ini dilakukan analisis studi kelayakan potensi pembangkit listrik tenaga hybrid dengan sumber energi terbarukan surya dan bayu untuk skala rumah tangga di daerah kota Bandung. Beban yang digunakan sebesar 4896Wh setiap hariny
Externí odkaz:
https://doaj.org/article/0ccd8a27da0f42f4b2a2be4caa40a18f
Publikováno v:
Journal of Electrical Power Control and Automation (JEPCA). 3:8
Voltage testing, on hybrid power plants (PLTH), uses two sources that are solar/solar power plants and waterwheel power plants. Supporting components to produce electric energy conversion one of them is boostconverter which is the main subject. There