Zobrazeno 1 - 10
of 19
pro vyhledávání: '"phased construction"'
Autor:
Ormeling, Marinus
Publikováno v:
Pražské egyptologické studie / Prague Egyptological Studies. (23):106-124
Externí odkaz:
https://www.ceeol.com/search/article-detail?id=843158
Autor:
Marinus Ormeling
Publikováno v:
Pražské Egyptologické Studie, Vol 2019, Iss XXIII, Pp 106-124 (2019)
In 1937 Walter Bryan Emery excavated tomb S3038 at Saqqara and discovered some astonishing new construction features inside. The tomb had a stepped core over the burial chamber, which was built over with two successive platforms, accessible from the
Externí odkaz:
https://doaj.org/article/8ca9b47181a743aeba08052f75809b79
Publikováno v:
Bases and Foundations; No. 41 (2020): Bases and Foundations; 32-44
Основи та Фундаменти / Bases and Foundations; № 41 (2020): Основи та фундаменти ; 32-44
Основи та Фундаменти / Bases and Foundations; № 41 (2020): Основи та фундаменти ; 32-44
The influence of the order of construction of houses on the formation of the stress-strain state of the system "foundation-foundation-above-ground structures" is investigated For this purpose, several options for setting tasks for the phased construc
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Autor:
Poukar, Kryštof
This diploma thesis deals with the proposal of a single box girder bridge of three spans in the town Blansko. It bridges the river Svitava and the main railway Praha - Brno. The calculations were carried out by hand, the model was created in the Scia
Externí odkaz:
http://www.nusl.cz/ntk/nusl-240286
Publikováno v:
Вестник МГСУ.
Исследован процесс взаимодействия здания с грунтовым основанием. Исследование проведено на основе численного моделирования строитель
The construction of several tunnels is underway at present in Croatia. The biggest is the Sveti Rok tunnel through Velebit Mountain. Its length is 5680 m. The tunnel consists of two separate tubes, and because of its length it is being drilled in two
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=57a035e5b1ae::4c73581a8245da554c0d58a70894c580
https://www.bib.irb.hr/140090
https://www.bib.irb.hr/140090
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Autor:
V. V. Orekhov
Publikováno v:
Vestnik MGSU, Iss 12, Pp 113-120
The interaction process of a power plant building with the soil base is studied basing on mathematical modeling of the construction process of Kambarata-2 HPP, taking into account the excavation of foundation pit, the concreting schedule of the build
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.