Zobrazeno 1 - 2
of 2
pro vyhledávání: '"pacing operation"'
Autor:
Nafakh, Abdullah Jalal, Davila, Franklin Vargas, Zhang, Yunchang, Fricker, John D., Abraham, Dulcy M.
Publikováno v:
JTRP Technical Reports
There are times when the traffic lanes through a work zone must be kept clear for activities such as placing overhead beams, erecting overhead signs, and installing power lines, and other temporary roadway work activities. As an alternative to a full
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::226de089ede66de04fe5976194b02c22
https://doi.org/10.5703/1288284317380
https://doi.org/10.5703/1288284317380
Autor:
Nafakh, Abdullah Jalal, Davila, Franklin Vargas, Zhang, Yunchang, Fricker, Jon D., Abraham, Dulcy M.
Publikováno v:
JTRP Technical Reports
Over the last two decades, an increasing number of highway construction and maintenance projects in the United States have been completed at night to avoid or alleviate traffic congestion delays. Working at night entails several advantages, including
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::1814dc6b2219cc5d86b61676ee627fe8
https://doi.org/10.5703/1288284317379
https://doi.org/10.5703/1288284317379