Zobrazeno 1 - 10
of 10
pro vyhledávání: '"operations phase"'
Autor:
Johan Ninan, Yirang Lim, Hans de Boer, Ossi Pesamaa, Maarten Van Acker, Eva Schwab, Johannes Bernsteiner, Peter Soderholm, Marcel Hertogh
Publikováno v:
Sustainable Futures, Vol 8, Iss , Pp 100308- (2024)
Infrastructure projects undergo multiple changes throughout their lifecycle, adapting to new mobilities, technologies and environments. We build on the System of Systems (SoS) theoretical concept to understand the implications of such infrastructure
Externí odkaz:
https://doaj.org/article/0bb19d0847b84ba4aaac4936dd71e22b
Publikováno v:
International Journal of Sustainable Engineering, Vol 16, Iss 1, Pp 224-235 (2023)
The construction sector is one of the most significant contributors to the carbon footprint. Buildings are primarily responsible for emitting high levels of carbon throughout their entire life cycle, from construction to operation and disposal. Resea
Externí odkaz:
https://doaj.org/article/91844b818f4b4ede8366aa107a30116d
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Autor:
Fontana, Bianca Cavedon
Publikováno v:
Repositório Científico de Acesso Aberto de Portugal
Repositório Científico de Acesso Aberto de Portugal (RCAAP)
instacron:RCAAP
Repositório Científico de Acesso Aberto de Portugal (RCAAP)
instacron:RCAAP
Dissertação de mestrado em European Master in Building Information Modelling
Throughout the building process, a high volume of information needs to be communicated, coordinated and exchanged. Building Information Modelling (BIM) shows up as an
Throughout the building process, a high volume of information needs to be communicated, coordinated and exchanged. Building Information Modelling (BIM) shows up as an
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=dedup_wf_001::3723a8a7a2d70731d347dc54c20c2d69
https://hdl.handle.net/1822/74792
https://hdl.handle.net/1822/74792
Publikováno v:
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT. 34(2):258-270
Morris (2013) calls for value creation for project stakeholders using project outcomes. This is an attempt to link the front end of the system lifecycle – the project phase – to the back end, i.e. the operations phase. Little is however known abo
Morris (2013) calls for value creation for project stakeholders using project outcomes. This is an attempt to link the front end of the system lifecycle - the project phase - to the back end, i.e. the operations phase. Little is however known about h
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od_______661::9acd2f04629134f1c8515913bf632dc4
https://aaltodoc.aalto.fi/handle/123456789/41241
https://aaltodoc.aalto.fi/handle/123456789/41241
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.