Zobrazeno 1 - 10
of 386
pro vyhledávání: '"hydropower stations"'
Publikováno v:
International Journal of Development Issues, 2024, Vol. 23, Issue 3, pp. 396-412.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/IJDI-08-2023-0194
Autor:
Ting Huang, Zongchao Li, Fangtou Tang, Jize Sun, Changhua Fu, Xiaohui Wang, Zhiwei Ji, Mengtan Gao, Kun Ye
Publikováno v:
地球与行星物理论评, Vol 55, Iss 4, Pp 440-452 (2024)
On September 5, 2022, an MS6.8 earthquake occurred in Luding County, Ganzi Prefecture, Sichuan Province, China, causing extensive damage. The scientific expedition team of the Institute of Geophysics of the China Earthquake Administration investigate
Externí odkaz:
https://doaj.org/article/18660a08b5c348d3b1f55a3d6db29410
Publikováno v:
International Journal of Electrical Power & Energy Systems, Vol 162, Iss , Pp 110226- (2024)
The integration of pumped storage units with conventional cascade hydropower to form a cascade hybrid pumped storage hydropower station (CHPHPS) is considered one of the effective approaches to expedite the development of pumped storage. However, mor
Externí odkaz:
https://doaj.org/article/dde5b023fee34fb79e5ccd05339b98e3
Publikováno v:
Kongzhi Yu Xinxi Jishu, Iss 6, Pp 92-97 (2023)
Current defect detection techniques for hydraulic structures at hydropower stations are conducted by inspection robots or divers, facing challenges such as limited inspection methods and the impact of water currents. In response to this, the paper de
Externí odkaz:
https://doaj.org/article/34248d13f69445a4977a41eb93139041
Publikováno v:
Water, Vol 16, Iss 20, p 2963 (2024)
To enhance the efficiency of solving the optimal operation model for cascade reservoirs, this paper first constructed an optimal operation model of cascade reservoirs. The model comprehensively considered the ecological flow, the guaranteed output of
Externí odkaz:
https://doaj.org/article/ebe425a5dccf444c9d6fe8ac6b7cd760
Publikováno v:
Energies, Vol 17, Iss 11, p 2734 (2024)
The massive grid integration of renewable energy necessitates frequent and rapid response of hydropower output, which has brought enormous challenges to the hydropower operation and new opportunities for hydropower development. To investigate feasibl
Externí odkaz:
https://doaj.org/article/c892b417f01b4756ad0172f5ba7b0bd2
Publikováno v:
Journal of Hydrology: Regional Studies, Vol 51, Iss , Pp 101615- (2024)
Study Region: Upper Amu Darya (UAD). Study Focus: The UAD has abundant hydropower potential (HP). This study focuses on the potential sites of small hydropower stations (sHPs) and explores the impact of future climate change on discharge and HP. New
Externí odkaz:
https://doaj.org/article/a61e1c4d764949d0a92cd56ba95971c2
Publikováno v:
Frontiers in Energy Research, Vol 11 (2023)
Cascade hydropower producers face two stages of risk when participating in medium and long-term market transactions: transaction risk during the bidding stage; and the operational risk during the scheduling and operation stage due to the uncertainty
Externí odkaz:
https://doaj.org/article/f710c4025c8d4705948adb3e2ae84310
Publikováno v:
Energy Reports, Vol 8, Iss , Pp 811-823 (2022)
With the gradual expansion of the development scale of wind power and photovoltaic (PV) power plants, the multi-energy complementary power generation system, typically represented by hydro-PV/hydro-wind/hydro-wind-PV, has become an important part of
Externí odkaz:
https://doaj.org/article/b2af26be5fca4869b33cf7d9e3d8c547
Publikováno v:
Energies, Vol 17, Iss 4, p 772 (2024)
There exists a temporal and spatial coupling effect among the hydropower units in cascade hydropower stations which constitutes a complex planning problem. Researching the multi-objective optimization scheduling of cascade hydropower stations under v
Externí odkaz:
https://doaj.org/article/b019ba283667429984489d04b56df6ad