Zobrazeno 1 - 5
of 5
pro vyhledávání: '"h-class gas turbine combined cycle power generation"'
Publikováno v:
南方能源建设, Vol 8, Iss 2, Pp 17-24 (2021)
[Introduction] The paper aims to study the dynamic performance of the H-class gas turbine foundation, obtain the relationship between the key influencing parameters and the basic performance of the gas turbine, and guiding the parameters selection an
Externí odkaz:
https://doaj.org/article/9318beca4d9848a8b24aef27894dd3c0
Publikováno v:
南方能源建设, Vol 8, Iss 2, Pp 11-16 (2021)
[Introduction] To find out the best extraction heating scheme according to the medium pressure heating steam parameters of large capacity combined cycle unit. [Method] Combined with the heat load characteristics of Zengcheng project, this paper discu
Externí odkaz:
https://doaj.org/article/821e12bf281f403fa9324918f5c27cea
Autor:
XIAO Jianqun
Publikováno v:
南方能源建设, Vol 8, Iss 2, Pp 31-36 (2021)
[Introduction] In order to fully implement the national policies on water resource development and utilization, embody the water-saving policies on water resource reuse, more and more industrial water source supplied to power plants in south China is
Externí odkaz:
https://doaj.org/article/3da045f3418649928b9bcd2ba71b420b
Publikováno v:
南方能源建设, Vol 8, Iss 2, Pp 1-10 (2021)
[Introduction] At present, investors in the power market have an increasing demand for digitization and intelligence of thermal power generation projects. Especially, overseas projects have put forward new requirements for the integrity and timelines
Externí odkaz:
https://doaj.org/article/b1c073e7fb15409caba7bf533be6180a
Autor:
Zheng Jinjian
Publikováno v:
南方能源建设, Vol 8, Iss 2, Pp 25-30 (2021)
[Introduction] In order to complete the compilation of energy saving report with high quality, taking the gas cogeneration project as an example, the key points and suggestions in the compilation were put forward. [Method] Based on the case of energy
Externí odkaz:
https://doaj.org/article/aa84bfac6e2741658ee3463c03fc7ced