Zobrazeno 1 - 10
of 299
pro vyhledávání: '"drum buffer rope"'
Autor:
Mayo-Alvarez, Luis a, Del-Aguila-Arcentales, Shyla a, Alvarez-Risco, Aldo b, ⁎, Chandra Sekar, M. c, Davies, Neal M. d, Yáñez, Jaime A. e
Publikováno v:
In Journal of Open Innovation: Technology, Market, and Complexity March 2024 10(1)
Autor:
Luis Mayo-Alvarez, Shyla Del-Aguila-Arcentales, Aldo Alvarez-Risco, M. Chandra Sekar, Neal M. Davies, Jaime A. Yáñez
Publikováno v:
Journal of Open Innovation: Technology, Market and Complexity, Vol 10, Iss 1, Pp 100228- (2024)
Highly volatile, uncertain, complex and ambiguous environments (VUCA) complicate and condition project management. With the emergence of agile project management, it is proposed to co-construct it with the client's active participation. Two used agil
Externí odkaz:
https://doaj.org/article/3c322ce0c1e74d4d9701e17120c515a5
Autor:
Telles, Eduardo Santos, Lacerda, Daniel Pacheco, Morandi, Maria Isabel Wolf, Ellwanger, Rodrigo, de Souza, Fernando Bernardi, Piran, Fabio Sartori
Publikováno v:
Journal of Manufacturing Technology Management, 2022, Vol. 33, Issue 6, pp. 1190-1209.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/JMTM-10-2021-0420
Autor:
Wojciech M. Kempa, Iwona Paprocka
Publikováno v:
Symmetry, Vol 16, Iss 1, p 63 (2024)
Producers are encouraged to reduce their energy consumption of manufacturing systems by applying less-energy-intensive modern technologies and advanced machine tools and operating methods at the system level. In the paper, organizational and analytic
Externí odkaz:
https://doaj.org/article/4a2eec4d40fc4dc2bc4b0c7490d51164
Publikováno v:
IEEE Access, Vol 10, Pp 84244-84266 (2022)
Planning and scheduling of multiple projects is significant for efficient utilization of constraint resources. However, in most of the project based companies, planning and scheduling of projects is performed in hierarchical manner with less focus gi
Externí odkaz:
https://doaj.org/article/88764460c4d34935bb576aac7bc6e74f
Autor:
Telles, Eduardo Santos a, ∗, Lacerda, Daniel Pacheco a, b, Morandi, Maria Isabel Wolf Motta b, Piran, Fabio Antonio Sartori a
Publikováno v:
In International Journal of Production Economics April 2020 222
Publikováno v:
Journal of Industrial Engineering and Management, Vol 13, Iss 1, Pp 18-37 (2020)
Purpose: This study is focused on integrating a strategic perspective for bottleneck selection and exploitation according to the DBR methodology. The researchers developed a systematic process of four steps for the implementation of the first two ste
Externí odkaz:
https://doaj.org/article/f29b42e11a8049878b5783b9fecddd09
Autor:
Humberto Govoni, Fernando Bernardi de Souza, Robson Flávio Castro, José de Souza Rodrigues, Silvio Roberto Ignacio Pires
Publikováno v:
Gestão & Produção, Vol 28, Iss 4 (2021)
Abstract: Theory of Constraints (TOC) states that every system has a single constraint that limits its performance, on which improvement efforts should be concentrated. This paper compared, through computer simulation, several methods of identifying
Externí odkaz:
https://doaj.org/article/6fa347296401420099d04e97417281f0
Publikováno v:
In Expert Systems With Applications 15 April 2019 120:87-102
Publikováno v:
GEPROS: Gestão da Produção, Operações e Sistemas, Vol 14, Iss 4, Pp 29-48 (2019)
This article aims to evaluate applicability of the Theory of Constraints (TOC) within the logistics subcategory, the Drum-Buffer-Rope (DBR). A case study of the production of expanded molded polystyrene (EPS), in a company located in the northeast re
Externí odkaz:
https://doaj.org/article/41db87bf3bf64c9ea29bfbfab503ed51