Zobrazeno 1 - 10
of 13
pro vyhledávání: '"dam filling"'
Autor:
Abay Yimere, Engdawork Assefa
Publikováno v:
AIMS Geosciences, Vol 7, Iss 3, Pp 313-330 (2021)
The Grand Ethiopian Renaissance Dam (GERD) in Ethiopia and High Aswan Dam (HAD) in Egypt both operate on the Nile River, independent of a governing international treaty or agreement. As a result, the construction of the GERD, the Earth's eighth large
Externí odkaz:
https://doaj.org/article/5da1cb1e7698481db982af28f442c2dd
Autor:
Ermyas Admasu Wolde, Abiot Desta Habte
Publikováno v:
PanAfrican Journal of Governance and Development, Vol 1, Iss 2 (2020)
The Nile River Basin, with eleven riparian countries, lacks any agreed-upon basin-wide legal framework. Attempts at effective management and utilization of water resources inclusive of all countries along the basin have not been possible due to lack
Externí odkaz:
https://doaj.org/article/aa92424251e9435a9772108cef0e49d5
Autor:
Hesham El-Askary, Amr Fawzy, Rejoice Thomas, Wenzhao Li, Nicholas LaHaye, Erik Linstead, Thomas Piechota, Daniele Struppa, Mohamed Abdelaty Sayed
Publikováno v:
Remote Sensing, Vol 13, Iss 21, p 4287 (2021)
The Grand Ethiopian Renaissance Dam (GERD), formerly known as the Millennium Dam, is currently under construction and has been filling at a fast rate without sufficient known analysis on possible impacts on the body of the structure. The filling of G
Externí odkaz:
https://doaj.org/article/963e758366b24702a2989978213ad462
Autor:
Abiot Desta Habte, Ermyas Admasu Wolde
Publikováno v:
PanAfrican Journal of Governance and Development; Vol. 1 No. 2 (2020); 4-29
PanAfrican Journal of Governance and Development, Vol 1, Iss 2 (2020)
PanAfrican Journal of Governance and Development, Vol 1, Iss 2 (2020)
The Nile River Basin, with ten riparian countries, lacks any agreed-upon basin-wide legal framework. Attempts at effective management and utilization of water resources inclusive of all countries along the basin have not been possible due to lack of
The Toukomtore dam in Burkina Faso was built as a road embankment to meet the water needs of the populations of the commune of Koubri. The dam's watershed is not immune to the various climatic and anthropogenic pressures that have caused it to fill u
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::ae69720d0a142a05d4790ac9928c9548
Autor:
Engdawork Assefa, Abay Yimere
Publikováno v:
AIMS Geosciences, Vol 7, Iss 3, Pp 313-330 (2021)
The Grand Ethiopian Renaissance Dam (GERD) in Ethiopia and High Aswan Dam (HAD) in Egypt both operate on the Nile River, independent of a governing international treaty or agreement. As a result, the construction of the GERD, the Earth's eighth large
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Autor:
Erik Linstead, Daniele C. Struppa, Amr Fawzy, Mohamed Abdelaty Sayed, Rejoice Thomas, Hesham El-Askary, Thomas C. Piechota, Nicholas LaHaye, Wenzhao Li
Publikováno v:
Remote Sensing
Volume 13
Issue 21
Pages: 4287
Remote Sensing, Vol 13, Iss 4287, p 4287 (2021)
Volume 13
Issue 21
Pages: 4287
Remote Sensing, Vol 13, Iss 4287, p 4287 (2021)
The Grand Ethiopian Renaissance Dam (GERD), formerly known as the Millennium Dam, is currently under construction and has been filling at a fast rate without sufficient known analysis on possible impacts on the body of the structure. The filling of G
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.