Zobrazeno 1 - 10
of 31
pro vyhledávání: '"cumulative resources"'
Publikováno v:
Data in Brief, Vol 48, Iss , Pp 109279- (2023)
This data article describes an instance dataset motivated by the problem of scheduling a project with diverging material flows. Such material flows are released during the execution of the project and are subject to limited processing and storage cap
Externí odkaz:
https://doaj.org/article/57d5db3f93494888a8e078e36743e793
Publikováno v:
Yugoslav Journal of Operations Research, Vol 29, Iss 1, Pp 31-42 (2019)
We consider a resource-constrained project scheduling problem with respect to the makespan minimization criterion. The problem accounts for technological constraints of activities precedence together with resource constraints. Activities pre- emption
Externí odkaz:
https://doaj.org/article/d84abc350dd4435c982f6ebc45470892
Autor:
Gehring, Marco
Um das umweltpolitische Ziel des Übergangs zu einer Kreislaufwirtschaft zu erreichen, wird im Bausektor statt eines konventionellen Abbruchs ein selektiver Rückbau angestrebt. Dabei wird eine Vermischung der bei der Demontage anfallenden Stoffe so
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::c1b0dfc3da573f770e6ac26a65d0ce17
https://publikationen.bibliothek.kit.edu/1000159498/150866285
https://publikationen.bibliothek.kit.edu/1000159498/150866285
Publikováno v:
European Journal of Operational Research, 303 (3), 1071-1087
This study deals with an extension of the resource-constrained project scheduling problem (RCPSP) by constraints on material flows released during the execution of project activities. These constraints arise from limited processing capacities for mat
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::00a1b16b7aabdb7cf18be944e9b15cb4
https://publikationen.bibliothek.kit.edu/1000145307
https://publikationen.bibliothek.kit.edu/1000145307
Publikováno v:
Journal of Industrial Engineering and Management, Vol 2, Iss 3, Pp 418-436 (2009)
This note deals with the problem of minimising the expected sum of quadratic holding and shortage inventory costs when a single, failure-prone machine produces multiple part-types. Shu and Perkins (2001) introduce the problem and, by restricting the
Externí odkaz:
https://doaj.org/article/6d7cba1d7e854fdba2fe2d7b1f840140
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Publikováno v:
Yugoslav Journal of Operations Research, Vol 29, Iss 1, Pp 31-42 (2019)
We consider the resource-constrained project scheduling problem with respect to the makespan minimization criterion. The problem accounts for technological constraints of activities precedence together with resource constraints. Activities preemption
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Autor:
Philippe Laborie
Publikováno v:
Artificial Intelligence. 143:151-188
This paper summarizes the main existing approaches to propagate resource constraints in Constraint-Based scheduling and identifies some of their limitations for using them in an integrated planning and scheduling framework. We then describe two new a