Publikováno v:
Ain Shams Engineering Journal, Vol 14, Iss 11, Pp 102524- (2023)
Duration, cost, and resources are defined as project constraints. Consequently, in each project, one of these constraints is received attention compared with another. Thus, the abilities of construction project manager should include balancing these
Externí odkaz:
https://doaj.org/article/6a7841bbcb1b44d5aceaca1e14862ddb
Publikováno v:
Journal of Engineering Research - Egypt, Vol 6, Iss 5, Pp 64-74 (2022)
Duration, cost, and resources are defined as constraints in projects. Consequently, Construction manager needs to balance between theses constraints to ensure that project objectives are met. Choosing the best alternative of each activity is one of t
Externí odkaz:
https://doaj.org/article/1c09f5414f104188baf350290325c0e5
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Publikováno v:
IEEE Access, Vol 9, Pp 5640-5650 (2021)
Internet of Things (IoT) environments are widely employed in industrial applications including intelligent transportation systems, healthcare systems, and building energy management systems. For such environments of highly sensitive data, adapting sc
Externí odkaz:
https://doaj.org/article/9421caff331940af937eb7610f3884a8
Autor:
Tariro Sithole, Gugu Mahlangu, Velma Capote, Tania Sitoie, Saren Shifotoka, Johannes Gaeseb, Silverani Padayachee, Tohlang Sehloho, Akida Khea, Adam Fimbo, Zuma Munkombwe, Bernice Mwale, Sam Salek, Stuart Walker
Publikováno v:
Frontiers in Medicine, Vol 8 (2021)
Introduction: National medicines regulatory agencies are faced with challenges including limited resources and technical capacity, resulting in countries collaborating and sharing resources to improve efficiency of the review process to facilitate ac
Externí odkaz:
https://doaj.org/article/0f7356289aab4d3b8e93bb94c6146e59
Publikováno v:
Journal of Project Management, Vol 4, Iss 3, Pp 195-212 (2019)
In this paper, a backward approach is proposed for maximizing net present value (NPV) in multi-mode resource constrained project scheduling problem while assuming discounted positive cash flows (MRCPSP-DCF). The progress payment method is used and al
Externí odkaz:
https://doaj.org/article/104b9d60c8a14d348d4f7f86d634933e
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Publikováno v:
Journal of Industrial Engineering and Management, Vol 9, Iss 3, Pp 732-785 (2016)
Purpose: The issue resource over-allocating is a big concern for project engineers in the process of scheduling project activities. Resource over-allocating drawback is frequently seen after scheduling of a project in practice which causes a schedule
Externí odkaz:
https://doaj.org/article/770dbf053a3a43109d9bdcc438abcfaf
Autor:
Mohammad Mazibar RAHMAN, Saiful ISLAM
Publikováno v:
Theoretical and Applied Economics, Vol XXI, Iss 7, Pp 87-98 (2014)
Relevant costing is a management accounting term that relates to focusing on only the costs relevant to a specific decision being made. It simplifies the decision-making process as it ignores cost data that is irrelevant, or will not have an impact o
Externí odkaz:
https://doaj.org/article/4dfba21649c04b0dbfbb92a17d9e0592
Autor:
Wolfgang Süß, Karl-Uwe Stucky, Günther Bengel, Sylvia Strack, Alexander Quinte, Wilfried Jakob
Publikováno v:
Algorithms, Vol 6, Iss 2, Pp 245-277 (2013)
This paper is motivated by, but not limited to, the task of scheduling jobs organized in workflows to a computational grid. Due to the dynamic nature of grid computing, more or less permanent replanning is required so that only very limited time is a
Externí odkaz:
https://doaj.org/article/e993148e2ecc41c5afe76f61d29ac148