Zobrazeno 1 - 10
of 1 317
pro vyhledávání: '"chance constraint"'
Publikováno v:
Water Supply, Vol 24, Iss 7, Pp 2427-2450 (2024)
This study addresses the pivotal challenge of water resource allocation in urban environments by introducing a novel approach – a multi-objective chance-constrained fuzzy interval linear programming model integrated with principal component analysi
Externí odkaz:
https://doaj.org/article/e71bfa904c4f4de4bd8005aa98da3038
Publikováno v:
电力工程技术, Vol 43, Iss 4, Pp 166-176 (2024)
Integrated energy systems enable the complementary utilization of various forms of energy. With the rapid increase in installed capacity of distributed generations, their intermittency and randomness have posed significant challenges to the operation
Externí odkaz:
https://doaj.org/article/0509bc147d29497da580696d192fe46f
Publikováno v:
International Journal of Electrical Power & Energy Systems, Vol 162, Iss , Pp 110334- (2024)
Based on the renewable portfolio standard and carbon cap-and-trade scheme, consumers faced with the demand of power and carbon emission permits shall be able to participate in three markets, i.e., green power market, electricity market and carbon mar
Externí odkaz:
https://doaj.org/article/099f61eab16340079fff8e1614bd9a66
Publikováno v:
IET Renewable Power Generation, Vol 18, Iss 3, Pp 545-557 (2024)
Abstract Virtual power plant (VPP) can aggregate distributed energy resources (DER) and controllable loads to participate in the bidding of electricity market and carbon trading market. However, the uncertainty of renewable power production brings hi
Externí odkaz:
https://doaj.org/article/156c448f4437425b9c0cb7398344ee10
A recursive Riccati interior-point method for chance-constrained stochastic model predictive control
Autor:
Jingyu Zhang, Toshiyuki Ohtsuka
Publikováno v:
SICE Journal of Control, Measurement, and System Integration, Vol 16, Iss 1, Pp 273-285 (2023)
This study covers the model predictive control of linear discrete-time systems subject to stochastic additive disturbances and state chance constraints. The stochastic optimal control problem is reformulated in a dynamic programming fashion to obtain
Externí odkaz:
https://doaj.org/article/ef9d626116f24632ad71ceab2288d2b4
Publikováno v:
Mathematics, Vol 12, Iss 18, p 2822 (2024)
This study proposes a novel mathematical model for the Multi-Day Tourist Trip Design Problem with Stochastic Travel Time and Partial Charging for Battery Electric Vehicle (MD-TTDP-STT-PCBEV). To the best of our knowledge, no prior study has fully inc
Externí odkaz:
https://doaj.org/article/78e5d5f46efb4987abb1e3571f29a7d0
Publikováno v:
Remote Sensing, Vol 16, Iss 18, p 3499 (2024)
The highly dynamic properties of maneuvering targets make it intractable for radars to predict the target motion states accurately and quickly, and low-grade predicted states depreciate the efficiency of resource allocation. To overcome this problem,
Externí odkaz:
https://doaj.org/article/3d18b367d305441196171b63aab5a7dc
Publikováno v:
Energy Reports, Vol 9, Iss , Pp 1717-1725 (2023)
Power systems with a high proportion of renewable energy are confronted with immense challenges and a huge amount of renewable energy has been curtailed. To promote the integration of renewable energy, this paper focus on exploiting the generation fl
Externí odkaz:
https://doaj.org/article/960b13c8d1064580bba5d7d6eb61e253
Publikováno v:
Communications in Transportation Research, Vol 3, Iss , Pp 100097- (2023)
This paper considers the problem of supply-demand imbalances in Mobility-on-Demand (MoD) services. These imbalances occur due to uneven stochastic travel demand and can be mitigated by proactively rebalancing empty vehicles to areas where the demand
Externí odkaz:
https://doaj.org/article/f01848da6a8840aea44ab19721308e26
Publikováno v:
Global Energy Interconnection, Vol 6, Iss 1, Pp 81-91 (2023)
This study proposes a two-stage photovoltaic (PV) voltage control strategy for centralized control that ignores short-term load fluctuations. In the first stage, a deterministic power flow model optimizes the 15-minute active cycle of the inverter an
Externí odkaz:
https://doaj.org/article/6dd39feb07da4f578df3631595c296df