Zobrazeno 1 - 10
of 27
pro vyhledávání: '"Zbigniew Kacprzyk"'
Publikováno v:
Symmetry, Vol 13, Iss 11, p 2152 (2021)
The designers of civil engineering structures often have to face the problem of the reliability of complex computational analyses performed most often with the Finite Element Method (FEM). Any assessment of reliability of such analyses is difficult a
Externí odkaz:
https://doaj.org/article/2cba3b3b86764bfc89231f14eb7bef5e
Publikováno v:
Symmetry
Volume 13
Issue 11
Symmetry, Vol 13, Iss 2152, p 2152 (2021)
Volume 13
Issue 11
Symmetry, Vol 13, Iss 2152, p 2152 (2021)
The designers of civil engineering structures often have to face the problem of the reliability of complex computational analyses performed most often with the Finite Element Method (FEM). Any assessment of reliability of such analyses is difficult a
Publikováno v:
IOP Conference Series: Materials Science and Engineering. 1015:012006
FEM models of axi-symmetrical reinforced concrete dome with two rings have been analysed. Different complexity level of computational models (2D and 3D), geometry simplifications and FEM codes (Abaqus, FEAS, ARSAP) have been compared. Assessment of b
Autor:
Zbigniew Kacprzyk
Publikováno v:
Zbigniew Kacprzyk
In this work, an unconditionally stable space-time finite element method is derived in its stationary form (the discretization is time invariant), [1] , [2] , [3] , [4] , [5] , [6] . The method formulation is solely displacement-based. An explicit or
Publikováno v:
Procedia Engineering. 91:87-92
The subject of this article concerns Isogeometric Analysis as a new formulation within Finite Element Method. Motivation for this new approach was presented together with theoretical foundations of the method. The main subject of the paper is numeric
Publikováno v:
MATEC Web of Conferences, Vol 196, p 01051 (2018)
This paper describes differences between models of a rectangular shaped reinforced concrete floor with ribs, commonly used by structural designers. Comparison analysis proves significant differences in result obtained from different models. Incompati
[Coronary venoplasty during the implantation of the cardiac resynchronisation device--a case report]
Autor:
Andrzej, Przybylski, Krzysztof, Cedro, Tomasz, Szajewski, Michał, Orczykowski, Piotr, Urbanek, Zbigniew, Kacprzyk, Lidia, Chojnowska, Adam, Witkowski, Witold, Ruzyłło, Franciszek, Walczak
Publikováno v:
Kardiologia polska. 65(10)
We describe a case of a 76-year-old patient with advanced block in the His-Purkjnie system, who underwent implantation of a cardioverter-defibrillator with cardiac resynchronisation therapy. Complete heart block occurred during the insertion of the c
Autor:
Tomasz Kępa, Zbigniew Kacprzyk
Publikováno v:
Procedia Engineering. :226-231
Building Information Modelling (BIM) is a process that involves creating, generating, managing and using a digital representations of physical and functional characteristics of building. The use of the term 4D is intended to refer to the fourth dimen
Autor:
Zbigniew Kacprzyk, Przemysław Czumaj
Publikováno v:
IOP Conference Series: Materials Science & Engineering; Nov2019, Vol. 661 Issue 1, p1-1, 1p
Publikováno v:
Scopus-Elsevier
Warsaw University of Technology-OmegaPSIR
Warsaw University of Technology-OmegaPSIR
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=dedup_wf_001::09a6551e86cc17df2f46825369d5c988
http://www.scopus.com/inward/record.url?eid=2-s2.0-0022136487&partnerID=MN8TOARS
http://www.scopus.com/inward/record.url?eid=2-s2.0-0022136487&partnerID=MN8TOARS