Zobrazeno 1 - 8
of 8
pro vyhledávání: '"Zaidil Yahia"'
Autor:
Akok Ramba, Abdullah Othman, Lakshmi Narayana Koyyalamudi, Noor Elfirdaous Elias, Zaidil Yahia, Syahezat Ismail, Azfar Israa Abu Bakar, Sarran Raaj Kunasekaran, Derk Naafs
Publikováno v:
Day 3 Thu, October 31, 2019.
BKR is a producing field, offshore Malaysia with almost 100 strings producing either naturally or utilizing gas lift as its primary artificial lift method. BKR being a mature field with increasing watercut production and declining reservoir pressures
Autor:
Amirul Adha Amsidom, Rafael Mohammad Zhafrael Mohammad, Zaidil Yahia, M Rizwan Rozlan, Parvinee Chaemchaeng, Mohammad Sazwan Ismail, Mohd Farris Bakar
Publikováno v:
Day 1 Mon, May 04, 2020.
Controlling sand has been one of the most difficult challenges in oil production in Upstream Malaysia operations. Conventionally, Cased Hole Gravel Packs (CHGP) or Open Hole Gravel Packs (OHGP) are installed to prevent sand from being produced with t
Autor:
Abdel Ben Amara, Sy Puteh Mariah Sy Rahim, M Rizwan Roslan, Syahezat Ismail, W Afiq Farhan Che Hamat, Stephen Faux, M Faizatulizuddin Ishak, Zaidil Yahia, Saied Mustafa Elshourbagi, Graham Makin
Publikováno v:
Day 3 Thu, October 25, 2018.
Objectives/Scope Moving to digitalization era in the current low oil price environment, paradigm shift is really crucial in managing brownfield development and production. The challenge is to select the best technology to harvest the optimum producti
Autor:
Hasmizah Bakar, Raja Nor Rafidah Raja Sahar, Dangchin Watchawong, Zaidil Yahia, Malaz Saleh, Wan Firda Asila Wan Muhaimin, Suzanna Juyanty Mohd Jeffrey
Publikováno v:
Day 2 Tue, August 28, 2018.
During the low oil price period, PETRONAS Carigali Sdn Bhd (PCSB) embarked on an intensified approach to prioritize the production enhancement and idle well reactivation (PE/IWR) activities in its Malaysia operations. To monetize the remaining reserv
Autor:
Kesavan Govinathan, Latief Riyanto, Kim Teng Yeo, Shazana M Zaki, Adhi Naharindra, Zaidil Yahia, Anis Izzuddin Othman, Tutus Kristanto
Publikováno v:
Day 2 Wed, March 22, 2017.
Field A, an oil field located in Peninsular Malaysia, was completed in 2007 with an initial production of 6,000 BOPD and managed to reach a peak production of 15,000 BOPD the same year, with a water cut of 15%. Toward the end of 2014, a decrease in p
Publikováno v:
All Days.
Brownfield is often associated with challenges to optimize production in cost effective manner due to declining well productivity and escalating cost. PCSB in its aspiration to reduce Idle Wells Inventory has extensively applied fit for purpose techn
Autor:
Zaidil Yahia, Ossama Zein El Abdein
Publikováno v:
All Days.
A brown field producing mainly from two main reservoirs, currently experiencing low reservoir pressures and high GOR ranging 400-1000 psig and 2000-20000 scf/stb respectively with about 17% average water cut. Re-perforation and adding new perforation
Conference
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.