Zobrazeno 1 - 10
of 47
pro vyhledávání: '"Yu. A. Radin"'
Publikováno v:
Thermal Engineering. 69:779-784
Publikováno v:
Power Technology and Engineering. 56:232-236
Publikováno v:
Power Technology and Engineering. 55:888-893
Publikováno v:
Power Technology and Engineering. 55:420-423
Autor:
Yu. A. Radin
Publikováno v:
Thermal Engineering. 68:481-489
Information about the research activities conducted at the All-Russia Thermal Engineering Institute (VTI) in the field of flexibility of steam power units at thermal power plants (TPPs) is given. Many of these activities were conducted jointly with s
Autor:
Yu. A. Radin, T. S. Kontorovich
Publikováno v:
Power Technology and Engineering. 54:720-725
The effect of the high-temperature steam path of steam turbines with combined HP-IP cylinder and HP and IP rotors located in separate casings, operating with either double- or single-bypass thermal circuit, on the thermal stress state is studied. Wit
Autor:
T. S. Kontorovich, Yu. A. Radin
Publikováno v:
Thermal Engineering. 68:59-64
One of the problems arising in start-up modes of combined-cycle power units is the preheating of steam pipelines in the high- and intermediate-pressure steam path whose time has a considerable effect on the total start-up time, especially during cold
Publikováno v:
Power Technology and Engineering. 54:527-531
A technical solution aimed at increasing the generation and expanding the operating capacity range and successfully implemented at CCPU-420 of the Mosenergo CHPP-20 is presented. In accordance with the technical proposals by the Siemens (SGTT) as a G
Publikováno v:
Power Technology and Engineering. 53:719-723
The principles of a program for monitoring stresses in rotors and bodies of stop and control valves of nonreheat steam turbines of up to 180 MW capacity to control the startup processes are formulated. The program based on the experimental data obtai
Publikováno v:
Power Technology and Engineering. 53:213-216
The paper presents the main specificatons of the Perm TPP and its main equipment, as well as their change resulting from the commissioning of PGU-800 power unit 4 after start-up and warranty tests at the PGU-800 start-up facility and comprehensive te