Zobrazeno 1 - 7
of 7
pro vyhledávání: '"Yangtian Yin"'
Publikováno v:
Journal of Management in Engineering. 39
Publikováno v:
Journal of Management in Engineering. 38
Publikováno v:
Journal of Management in Engineering. 38
Publikováno v:
Journal of Management in Engineering. 37
Although the use of alternative contracting methods (ACMs) has become increasingly common, little is known about their effects on a project’s time-cost-change performance. This study draws ...
Publikováno v:
Journal of Management in Engineering. 37
Incentive/disincentive (I/D) and cost-plus-time (A+B) are two of the most widely used alternative contracting methods (ACMs) for accelerating the construction of highway infrastructure impr...
Despite the abundance of research that has aimed to understand the effects of highway work zones, very little definitive information is available concerning the determination of work zone length (WZL). Quantitative studies that holistically model WZL
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::333bbe834800efc129cca818b9094f61
Publikováno v:
Journal of Management in Engineering. 36
Many state transportation agencies (STAs) have adopted alternative contracting methods, including design-build (DB) contracting, to accelerate construction. Although DB has become increasin...