Zobrazeno 1 - 10
of 11
pro vyhledávání: '"Yakup Atasagun"'
Publikováno v:
Journal of Computer Science. 17:440-450
Autor:
Yakup Atasagun, Yakup Kara
Publikováno v:
Volume: 9, Issue: 2 314-326
Konya Mühendislik Bilimleri Dergisi
Konya Mühendislik Bilimleri Dergisi
Bu çalışmada, Konya’da faaliyet gösteren ve güneş enerjisi kolektörü üreten bir firmanın montaj hatlarında kaynak bağımlı görev süreleri ile paralel montaj hattı dengeleme uygulaması yapılmıştır.Öncelikle ilgili firmanın mon
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::ca838f790ca8b66ce6fe8e48b373c0b2
https://dergipark.org.tr/tr/pub/konjes/issue/62624/816944
https://dergipark.org.tr/tr/pub/konjes/issue/62624/816944
Publikováno v:
International Series in Operations Research & Management Science ISBN: 9783319975108
The concept of Shojinka, which is an important element of Just in Time production system, is attaining flexibility on the number of workers in a workshop due to demand variations.
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::4dd80874925f47f68a5524aee3d7327d
https://doi.org/10.1007/978-3-319-97511-5_9
https://doi.org/10.1007/978-3-319-97511-5_9
Publikováno v:
International Journal of Production Research. 52:7262-7275
In real world, line balancing involves existing lines in existing factories and the line typically needs to be rebalanced rather than balanced. Rebalancing of a U-line can be defined as a changeover process from its initial configuration to a new con
Autor:
Yakup Atasagun, Yakup Kara
Publikováno v:
Neural Computing and Applications. 25:237-250
Assembly line balancing is the problem of assigning tasks to workstations by optimizing a performance measure while satisfying precedence relations between tasks and cycle time restrictions. Many exact, heuristic and metaheuristic approaches have bee
Autor:
Yakup Atasagun, Yakup Kara
Publikováno v:
MIM
In this study, Resource Dependent Assembly Line Balancing approach is adapted to the concept of Parallel Assembly Line Balancing and this problem is called Parallel Assembly Line Balancing with Resource Dependent Task Times (RDALB_P). A binary intege
Publikováno v:
International Journal of Production Research. 49:6387-6405
The basic assumption of assembly line balancing is that every task's time is fixed. However, in practice, different processing alternatives may be available to process a task with different times. The problem in this case is to assign tasks and resou
Publikováno v:
International Journal of Computer Integrated Manufacturing. 23:402-411
Traditional straight assembly lines are still one of the most important elements and an important fact of today's production systems. If applicable, a company can combine its multiple straight assembly lines and obtain many advantages of Shojinka mor
An integrated model to incorporate ergonomics and resource restrictions into assembly line balancing
This study incorporates ergonomics and resource restrictions into assembly line balancing (ALB). For this purpose, an integrated model is proposed. The proposed model is essentially a cost-oriented formulation for ALB under psychological strain, phys
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::fdb23014cbcce7b6b4360041974fac98
https://avesis.kayseri.edu.tr/publication/details/c33454b1-1265-4424-9c67-7e856f240907/oai
https://avesis.kayseri.edu.tr/publication/details/c33454b1-1265-4424-9c67-7e856f240907/oai
Balancing parallel assembly lines provides flexibility to minimise the total idle times of assembly lines and the total number of workstations required in production facilities. This paper proposes two goal programming approaches to balance parallel
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::c018f2a81a3205c95d44475874bac72e
https://avesis.gazi.edu.tr/publication/details/9dc22a42-837d-4471-9798-0a90d443518b/oai
https://avesis.gazi.edu.tr/publication/details/9dc22a42-837d-4471-9798-0a90d443518b/oai