Zobrazeno 1 - 8
of 8
pro vyhledávání: '"Xueshan Ai"'
Publikováno v:
Energies, Vol 17, Iss 19, p 4966 (2024)
The water consumption rate for hydropower station power generation is an important index of the economic operation of hydropower stations, which has been widely considered and applied in the production practice of hydropower stations and has great si
Externí odkaz:
https://doaj.org/article/d9c4faec799943e2951b7dfba980611b
The long-term operation of the reservoir at the flood limit water level in the flood season is not conducive to the exertion of the comprehensive benefits of the reservoir, especially in the flood free period, the operation of the reservoir at the fl
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::1d74303713ac2c1bd8c143a0c9c779c0
https://doi.org/10.21203/rs.3.rs-1311268/v1
https://doi.org/10.21203/rs.3.rs-1311268/v1
Publikováno v:
Applied Energy. 320:119256
Publikováno v:
Journal of Cleaner Production. 270:122066
The operation of the Three Gorges Reservoir (TGR) has changed the original flow regimes in the reservoir area, as well as middle and lower reaches of the Yangtze River, which may lead to algal blooms in the tributaries of TGR, changing conditions in
Publikováno v:
Water Resources Management. 30:523-540
Operations of multi-reservoir systems are nonlinear and high-dimensional problems, which are difficult to find the optimal or near-optimal solution owing to the heavy computation burden. This study focuses on flood control operation of multi-reservoi
Publikováno v:
Kybernetes. 39:864-870
PurposeThe purpose of this paper is to obtain risk indicators of water security of drought periods in which the indices of reliability, resiliency, and vulnerability are integrated.Design/methodology/approachIt is not reasonable that weight coefficie
Autor:
ZhiYun Gao, XueShan Ai
Publikováno v:
Advances in Computer Science, Intelligent System and Environment ISBN: 9783642237522
CSISE (3)
CSISE (3)
The optimal scheduling figure is an important means to realize the maximal comprehensive benefit of the reservoir. Based on the ideas of reservoir normal operation graph, the paper puts forward to combined optimal method of drawing optimal scheduling
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::5dcee1ef6f6caeadbdeb07a8701956be
https://doi.org/10.1007/978-3-642-23753-9_17
https://doi.org/10.1007/978-3-642-23753-9_17
Autor:
Senlin Chen, Xueshan Ai
Publikováno v:
2010 Asia-Pacific Power and Energy Engineering Conference.
The Three Gorges cascade composed of the Three Gorges and the Gezhouba. The backwater effect of the Gezhouba Reservoir and the "time lag" effects exist between the two dams make the calculation of water flow more complex. Taking into account the infl