Zobrazeno 1 - 10
of 10
pro vyhledávání: '"Xikun Zhao"'
Publikováno v:
The International Journal of Advanced Manufacturing Technology. 125:1661-1678
Publikováno v:
The International Journal of Advanced Manufacturing Technology. 121:4941-4960
Publikováno v:
IEEE Transactions on Automation Science and Engineering. 19:772-787
In a machining process, proper selection of process plans and cutting parameters can effectively reduce energy consumption and shorten production time. Traditionally, studies on process planning and cutting parameter optimization for energy saving ar
Publikováno v:
International Journal of Precision Engineering and Manufacturing-Green Technology. 9:1329-1347
Disassembly is an important part of green manufacturing and remanufacturing. The disassembly line is an optimum form for mass and automatic disassembly in the industry. To optimize the disassembly system and the use of resources, the disassembly line
Publikováno v:
IEEE Robotics and Automation Letters. 6:7807-7814
Selective disassembly sequence planning (SDSP) is regarded as an efficient strategy to determine optimal disassembly sequences for extracting target parts (TP) from complex end-of-life (EOL) products. Previous research assumes that all EOL products h
Publikováno v:
Frontiers of Mechanical Engineering. 16:546-558
Remanufacturing, as one of the optimal disposals of end-of-life products, can bring tremendous economic and ecological benefits. Remanufacturing process planning is facing an immense challenge due to uncertainties and fuzziness of recoverable product
Publikováno v:
International Journal of Precision Engineering and Manufacturing-Green Technology. 9:709-728
Cutting parameters and machining configurations affect the energy consumption and production time in the machining process significantly. Previous cutting parameters optimization methods are proposed for a specific machining configuration that limits
Publikováno v:
Robotics and Computer-Integrated Manufacturing. 81:102491
Autor:
Tengfei Guo, Ke Wang, Pingshuan Dong, Laijing Du, Huifeng Zhang, Hengliang Zhang, Xvming Yang, Xikun Zhao, Peng Yan, Tengfei Wang
Publikováno v:
Clinical Cardiology
Background This study aims to estimate prognostic indicators of new onset atrial fibrillation (AF) in patients with acute coronary syndrome (ACS) through 3 to 5 years of follow‐up. Hypothesis For patients with ACS, some prognostic indicators can be
Publikováno v:
International Journal of Precision Engineering and Manufacturing-Green Technology. 8:233-247
Disassembly is the first step in product recycling and remanufacturing. When disassembling large quantities of products, the disassembly efficiency is crucial for enterprises. Thus, disassembly line is the best choice for automated disassembly of dis