Zobrazeno 1 - 10
of 85
pro vyhledávání: '"Xiangtian Nie"'
Publikováno v:
Heliyon, Vol 10, Iss 16, Pp e36481- (2024)
Taking into account the fluctuation of the growth rate on the left and right sides of the classic QGLF, a quadratic exponential quality gain-loss function (QGLF) is created based on the asymmetric QGLF. The two scenarios of non-normal distribution (t
Externí odkaz:
https://doaj.org/article/4549fa67628e478eb077402c44973cb0
Publikováno v:
Water, Vol 16, Iss 6, p 809 (2024)
In China, the water network project plays a pivotal role in optimizing water resources allocation, enhancing regional water resources carrying capacity, and bolstering high-quality economic development. This study is grounded in the spatial interconn
Externí odkaz:
https://doaj.org/article/174d135d8fee43b1bc5251cda0d082ea
Publikováno v:
Buildings, Vol 13, Iss 4, p 942 (2023)
In project network planning, the correlation complexity of the processes is not only related to the immediately preceding and following processes, but also closely related to indirect adjacent processes. In the existing relevant studies, many scholar
Externí odkaz:
https://doaj.org/article/570cdabb14234a20acfce4f740bdf184
Publikováno v:
Frontiers in Psychology, Vol 12 (2021)
The coronavirus disease 2019 (COVID-19) pandemic has been regarded as a public health emergency that caused a considerable degree of public panic (such as anxiety and insomnia) during its early stage. Some irrational behaviors (such as excessive sear
Externí odkaz:
https://doaj.org/article/0e7368f5cbcc4ef9b7b46e2998d6b9fc
Publikováno v:
Mathematical Problems in Engineering. 2022:1-7
On the basis of analyzing the relationship between a contractor’s credit, project quality assurance, owner’s monitoring level, and the quality guarantee deposit, the quality expected benefit model of the owner and the contractor was constructed u
Publikováno v:
Scientific Programming. 2022:1-8
The setting of the buffer size on critical chain will impose an impact on the determination of the project duration. In order to effectively calculate the buffer size, we have comprehensively taken into account the influence of duration-related risks
Publikováno v:
Journal of Coastal Research. 3/9/2019, Vol. 93, p798-803. 6p.
Publikováno v:
Journal of Computational Methods in Sciences and Engineering. 22:161-174
When an engineering project requires a lot of time and the construction environment is complex, the unit price of materials and personnel will change, the project construction will be hindered, and the construction plan of the project should be adjus
Publikováno v:
Desalination & Water Treatment; May2023, Vol. 293, p89-99, 11p
Publikováno v:
Symmetry, Vol 11, Iss 3, p 337 (2019)
In engineering projects, project duration and a cost increase occur in every phase and will propagate their impacts downstream. Associated with the compensation of project duration, the duration and cost impacts are transferred among phases. In this
Externí odkaz:
https://doaj.org/article/50bde9de7819477d8b3bba54dfa0ee5e