Zobrazeno 1 - 7
of 7
pro vyhledávání: '"Xianfei Jin"'
Publikováno v:
Transportation Research Part B: Methodological. 113:70-90
We consider the aircraft recovery problem (ARP) with airport capacity constraints and maintenance flexibility. The problem is to re-schedule flights and re-assign aircraft in real time with minimized recovery cost for airlines after disruptions occur
Publikováno v:
International Journal of Production Economics. 145:349-358
In this research, we study a supply chain which consists of a firm and a set of customer groups, where the demand (order quantity) from each customer group depends on the quoted delivery time. The prices of the product are determined and different to
Simulation based lean six sigma approach to reduce patients waiting time in an outpatient eye clinic
Publikováno v:
IEEM
This paper describes a simulation based lean six sigma approach to improve the operations in an outpatient eye clinic in Singapore. The concept of the simulation based lean six sigma approach and its application into healthcare industry are examined
Publikováno v:
2013 Winter Simulations Conference (WSC).
Optimal price and delivery time quotation with production scheduling for make-to-order manufacturing
Autor:
Xianfei. Jin
Customers have varying requirements on price and delivery time in make-to-order manufacturing environment. Due to limited availability of the production capacity, the firm can increase revenue if it allocates priority to time-sensitive customers, cha
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::cd5938e9ff91d5c2b719026f58f32cbf
https://hdl.handle.net/10356/48670
https://hdl.handle.net/10356/48670
Publikováno v:
2007 IEEE International Conference on Industrial Engineering and Engineering Management.
This paper concerns on the case of the supply chain of an electronics manufacturer. The manufacturer encountered problems in daily operations. The problem is formulated as a synchronized scheduling of air transportation and parallel machine schedulin
Publikováno v:
2007 IEEE International Conference on Industrial Engineering & Engineering Management; 2007, p1629-1633, 5p