Publikováno v:
IEEE Access, Vol 11, Pp 64370-64382 (2023)
Reactive project scheduling is an important branch of project scheduling under uncertainty. This paper proposes a resource-constrained multi-project reactive scheduling problem (RCMPRSP) with new project arrival to minimize the adjustment cost of the
Externí odkaz:
https://doaj.org/article/e43721e49bbe4b619cf61b2a4f5ac7d2
Publikováno v:
IEEE Access, Vol 10, Pp 52700-52711 (2022)
In the process of project implementation, the deviation usually exists between the actual scheduling process and the predefined schedule. A typical situation is that the project cannot be executed according to the generated schedule due to the uncert
Externí odkaz:
https://doaj.org/article/aed65991d1624e65bf55b099864b7335
Publikováno v:
Applied Mathematical Modelling. 96:834-859
Due to both carbon policy and consumer environmental awareness, the large amount of carbon emissions generated while keeping deteriorating products fresh has attracted attention. In particular, under international competition, both freshness and envi
Autor:
Wuliang Peng, Xuejun Lin
Publikováno v:
Flexible Services and Manufacturing Journal.
Publikováno v:
Journal of Construction Engineering and Management. 148
Publikováno v:
Annals of Operations Research. 308:389-414
In enterprise project management systems, a program at the tactical level coordinates and manages multiple projects at the operational level. There are close relationships between multiple projects in a program, which are typically manifested as shar
Publikováno v:
Memetic Computing. 13:271-284
Multi-objective project scheduling has attracted wide attention for approximately two decades. However, most of the existing research has focused on the double-objective project scheduling problem, while literature on project scheduling problems with
Publikováno v:
Expert Systems with Applications. 214:119188
Publikováno v:
Discrete Dynamics in Nature and Society, Vol 2015 (2015)
We consider a single parallel-batching machine scheduling problem with delivery involving both batching scheduling and common due date assignment. The orders are first processed on the single parallel-batching machine and then delivered in batches to
Externí odkaz:
https://doaj.org/article/6fa94f285eef4af5b90da39fec232606
Autor:
Wuliang, Peng, Chengen, Wang
Publikováno v:
In International Journal of Project Management 2009 27(6):600-609