Zobrazeno 1 - 10
of 17
pro vyhledávání: '"Wojciech Rogala"'
Autor:
Hubert Anysz, Wojciech Rogala
Publikováno v:
Przegląd Naukowy Inżynieria i Kształtowanie Środowiska, Vol 28, Iss 2, Pp 183-191 (2019)
Based on catalogues, the time schedule of erecting multi-storey building has been prepared. Real current conditions and the average cost of the building allows for creating the model where four variables influence NPV and maximum cash demand of a con
Externí odkaz:
https://doaj.org/article/709c1c2bc0184d0bb601b8399edc9d61
Autor:
Wojciech Rogala, Hubert Anysz
Publikováno v:
Przegląd Naukowy Inżynieria i Kształtowanie Środowiska, Vol 28, Iss 1, Pp 161-168 (2019)
The paper presents the comparison of deterministic and stochastic approach for modeling the set of earthworks machinery. Simulation takes into account the normal distribution of cycle time and efficiency of machines and points out its influence for t
Externí odkaz:
https://doaj.org/article/b42dd3a7530c49c2b043ce2b41e479ae
Autor:
Katarzyna Dębkowska, Łukasz Dymek, Krzysztof Kutwa, Dariusz Perło, Dorota Perło, Wojciech Rogala, Urszula Ryciuk, Marzena Szewczuk-Stępień
Publikováno v:
Energies, Vol 15, Iss 2, p 581 (2022)
The aim of this article was to assess the efficiency of the utilization of public funds for climate neutrality. It was concluded that the data gathered in public statistics are not adapted to current challenges and hinder the direct measurement of cl
Externí odkaz:
https://doaj.org/article/03aeb45048c34c7091505ccb8cf82e23
Autor:
Hubert Anysz, Wojciech Rogala
Publikováno v:
Przegląd Naukowy Inżynieria i Kształtowanie Środowiska, Vol 27, Iss 3, Pp 280-290 (2018)
An essay presents the method and tool which can be used to control the mass of aggregates deliveries under construction site conditions. The method based on statistics allows determining the optimal quantity of transports to be inspected, required to
Externí odkaz:
https://doaj.org/article/4ddfd58526cd4374b51460d83d0273b7
Autor:
Robert Turski, Wojciech Rogala
Publikováno v:
Cement Wapno Beton. 27:154-165
The article presents the current situation of the industry manufacturing autoclaved aerated concrete and the possibilities for further development. It presents a roadmap for the industry to achieve net-zero-emission during production and life cycle t
Autor:
Wojciech Rogala
Publikováno v:
ACTA SCIENTIARUM POLONORUM - Architectura Budownictwo. 18:43-50
Autor:
Wojciech Rogala, Hubert Anysz
Publikováno v:
Przegląd Naukowy Inżynieria i Kształtowanie Środowiska, Vol 28, Iss 2, Pp 183-191 (2019)
Based on catalogues, the time schedule of erecting multi-storey building has been prepared. Real current conditions and the average cost of the building allows for creating the model where four variables influence NPV and maximum cash demand of a con
Autor:
Hubert Anysz, Wojciech Rogala
Publikováno v:
Przegląd Naukowy Inżynieria i Kształtowanie Środowiska, Vol 28, Iss 1, Pp 161-168 (2019)
The paper presents the comparison of deterministic and stochastic approach for modeling the set of earthworks machinery. Simulation takes into account the normal distribution of cycle time and efficiency of machines and points out its influence for t
Publikováno v:
Materials, Vol 14, Iss 1390, p 1390 (2021)
Materials
Volume 14
Issue 6
Materials
Volume 14
Issue 6
The main advantage of the structural composite material known as cement-stabilized rammed earth (CSRE) is that it can be formulated as a sustainable and cost-saving solution. The use of the aggregates collected very close to a construction site allow
Autor:
Wojciech Rogala, Janusz Rybak, Tomasz Zubilewicz, Marek Iłżecki, Piotr Terlecki, Marek Majewski, Stanisław Przywara
Publikováno v:
Acta Angiologica. 24:74-79
Introduction. Over time, endovascular techniques of abdominal aortic aneurysm repair became the principal methods of treatment of this potentially fatal disease. Currently, endovascular aneurysm repair (EVAR) constitutes an effective alternative to o