Zobrazeno 1 - 10
of 33
pro vyhledávání: '"W.W. Gardiner"'
The objective of the Bronx River project was to evaluate proposed dredged material from the Bronx River project area in Bronx, New York, to determine its suitability for unconfined ocean disposal at the Mud Dump Site. Bronx River was one of five wate
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::77123bc5a3cb2049d512f46176e053ab
https://doi.org/10.2172/434287
https://doi.org/10.2172/434287
The objective of the Westchester Creek project was to evaluate proposed dredged material from this area to determine its suitability for unconfined ocean disposal at the Mud Dump Site. Westchester Creek was one of five waterways that the US Army Corp
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::f15307b8844b69c186eb029a273797db
https://doi.org/10.2172/425222
https://doi.org/10.2172/425222
The Hudson River (Federal Project No. 41) was one of seven waterways that the U.S. Army Corps of Engineers-New York District (USACE-NYD) requested the Battelle Marine Sciences Laboratory (MSL) to sample and evaluate for dredging and disposal in March
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::417b92a39fd4e230d5f4f3550d6e3afe
https://doi.org/10.2172/408098
https://doi.org/10.2172/408098
The objective of the Shark River Project was to evaluate proposed dredged material to determine its suitability for unconfined ocean disposal at the Mud Dump Site. Tests and analyses were conducted on the Shark River sediments. The evaluation of prop
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::62cf0a86ef2722920fcb35d72a0da460
https://doi.org/10.2172/408133
https://doi.org/10.2172/408133
South Brother Island Channel was one of seven waterways that the US Army Crops of Engineers-New York District requested the Battelle/Marine Sciences Laboratory to sample and evaluate for dredging and disposal. Tests and analyses were conducted on Sou
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::68317e35dc811920a32fc0aa9614e2fc
https://doi.org/10.2172/432775
https://doi.org/10.2172/432775
Buttermilk Channel was one of seven waterways that was sampled and evaluated for dredging and sediment disposal. Sediment samples were collected and analyses were conducted on sediment core samples. The evaluation of proposed dredged material from th
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::bdfec2a408e367b8bb89d378dfbe8628
https://doi.org/10.2172/406052
https://doi.org/10.2172/406052
Autor:
J. Q. Word, L. B. Rosman, B.D. Gruendell, H.L. Mayhew, E.S. Barrows, N.P. Kohn, L.D. Antrim, M. R. Pinza, W.W. Gardiner
The U.S. Army Corps of Engineers (USACE) is authorized by Section 103 of the Marine Protection, Research, and Sanctuaries Act of 1972 (MPRSA), Public Law 92-532, and by the Clean Water Act of 1972 (CWA) and Amendments of 1977 to permit, evaluate, and
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::42463b5ea7212b7455659b1998b83c3e
https://doi.org/10.2172/432776
https://doi.org/10.2172/432776
Autor:
W.W. Gardiner, E.S. Barrows, J. Q. Word, L.D. Antrim, M. R. Pinza, B.D. Gruendell, J.J.S. Tokos
The objective of the Eastchester project (Federal Project [FP] No. 6) was to evaluate proposed dredged material from the Eastchester project area in the Hutchinson River to determine its suitability for unconfined ocean disposal at the Mud Dump Site.
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::9ed071265ea2095447718ca770ec21fd
https://doi.org/10.2172/434290
https://doi.org/10.2172/434290
Based on the results of this study and literature review, the following conclusions can be made: Sediment grain size and TOC (total organic carbon) influence contaminant fate and transport (in general, sediments with higher TOC content and finer grai
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::c75955bb4a2a0e3a9af5657b048ed7c9
https://doi.org/10.2172/56591
https://doi.org/10.2172/56591
The port of Georgetown, South Carolina, is served by navigational channels within Winyah Bay and the lower Sampit River. Dredging is required to maintain these waterways and to facilitate normal shipping traffic. Prior to dredging, ecological evaluat
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::5dc6cf5e60697f1ae9910821dfb6cd35
https://doi.org/10.2172/28397
https://doi.org/10.2172/28397