Zobrazeno 1 - 10
of 688
pro vyhledávání: '"W. Karwowski"'
Publikováno v:
Advances in Ergonomics In Design, Usability & Special Populations: Part II.
A comparison of traditional work time study and the study of temporal parameters of operator’s performance demonstrate that they have both common and distinctive features. However, in both cases concept of time structure of performer’s activity s
Publikováno v:
IABSE Symposium, Wroclaw 2020: Synergy of Culture and Civil Engineering – History and Challenges.
Poniatowski Bridge and Viaduct across Vistula River in Warsaw, Poland was damaged during I and II World War and rebuild after them. Total length of the bridge is 504.00 m and of the viaduct is 701.00 m. From 50- ties XX century up to now both of them
Publikováno v:
Archives of Civil Engineering, Vol 64, Iss 4, Pp 65-76 (2018)
The hereby paper discusses the influence of cable length on the SHM systems with the use of vibrating wire dynamic measurements. Vibrating wire sensors are mainly used for measuring stable or slowly changing strains, e.g. system installed on Rędziń
Publikováno v:
Archives of Civil Engineering, Vol 64, Iss 4, Pp 187-201 (2018)
The paper presents results of the laboratory tests made for the prototype resilient under sleeper pads in the Warsaw University of Technology laboratory unit. These pads are dedicated to reduce vibrations transmitted to the vicinity of the railroad a
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Publikováno v:
IABSE Congress, New York, New York 2019: The Evolving Metropolis.
The problem of bridge fires is growing. Because of a bad experience in Poland, it was decided to improve fire resistance of long span bridge structures, and of cable-stayed bridges in particular. Statistics shows that fire is a real threat to this ki
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Publikováno v:
Archives of Civil Engineering, Vol 62, Iss 4, Pp 171-186 (2016)
On the 14th of February, 2015, a huge fire broke out on Łazienkowski Bridge; a five span bridge, 423 m long and 28 m wide, built in the years 1972-74. It was a fully steel structure with four plate girders and orthotropic deck. The fire started unde
Kniha
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Kniha
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.