Zobrazeno 1 - 3
of 3
pro vyhledávání: '"W. Helmi W. Hasan"'
Autor:
Sunanda Magna Bela, Abdil Adzeem B. Ahmad Mahdzan, Noor Hidayah A. Rashid, Zairi A. Kadir, Azfar Israa Abu Bakar, Zayful Hasrin Kamarudzaman, W Helmi W. Hasan, M Abshar B. M. Nor, M Yusof M. Aziss, Ezuan Hanafi Razali, M Idham Adli Musa, Saifol Anuar Mat Isa, Khai Lun Tham, Sivnes Raj Arumugam, Saharul Hashim, Anandhadhasan Balasandran
Publikováno v:
Day 2 Wed, March 23, 2022.
Gravel packing in a multilayer reservoir during an in?ll development project requires treating each zone individually, one after the other, based on reservoir characterization. This paper discusses the installation of an enhanced 7-in. multizone syst
Autor:
Azfar Israa Abu Bakar, Sivnes Raj Arumugam, Zairi Kadir, M. Abshar B. M. Nor, W. Helmi W. Hasan, Anandhadhasan Balasandran, Zayful Hasrin Kamarudzaman, Sunanda Magna Bela, Abdil Adzeem B Ahmad Mahdzan, Noor Hidayah A Rashid, M Yusof M Aziss, Khai Lun Tham, Saharul Hashim
Publikováno v:
Day 1 Tue, March 23, 2021.
Gravel packing in a multilayer reservoir during an infill development project requires treating each zone individually, one after the other, based on reservoir characterization. This paper discusses the installation of an enhanced 7-in. multizone sys
Autor:
Noor Hidayah A Rashid, Abdil Adzeem B Ahmad Mahdzan, Azfar Israa Abu Bakar, Pui Ling Chin, Sunanda Magna Bela, Syukri Shahabuddin, Saharul Hashim, Zairi Kadir, Nicholas Moses, Zayful Hasrin Kamarudzaman, M. Abshar B. M. Nor, W. Helmi W. Hasan, Muhammad Yusof Bin Mohd Aziss
Publikováno v:
Day 1 Tue, March 23, 2021.
A multizone cased hole completion with a bottom hole assembly of world-record length at 2,600 ft was installed in Malaysia in November 2019 where three zones were simultaneously gravel packed in a single trip utilizing shunt tube technology. This san