Zobrazeno 1 - 8
of 8
pro vyhledávání: '"Victor V. Tochilkin"'
Publikováno v:
Ferrous Metallurgy. Bulletin of Scientific , Technical and Economic Information. 75:1037-1045
Perfection of the structure and modernization of billet CCMs elements is an important task of the modem metallurgy, solving of which provides an increase of machines productivity and continuously casted billets quality. The system tundish (T) -submer
Publikováno v:
NOVYE OGNEUPORY (NEW REFRACTORIES). :3-7
The article discusses the equipment, installed in the casting chamber tundish of continuous casting machines (CCM). Improving the equipment provides an effective formation of the metal flows and creates conditions for the improvement of its quality.
Publikováno v:
NOVYE OGNEUPORY (NEW REFRACTORIES). :9-13
The refractory outft of the steel-teeming ladle (STL)‒ metal jet (MJ)‒intermediate ladle (IL) was regarded in the article for the billet continuous casters (CCM). The metal flow management was investigated for this system. The peculiarities of t
Publikováno v:
Refractories and Industrial Ceramics. 58:349-353
Equipment installed in the pouring chambers of the tundish of continuous section casters is considered. Improvements made to the equipment assure efficient formation of the metal stream and create conditions for increasing the quality of the metal.
Publikováno v:
Refractories and Industrial Ceramics. 58:1-4
Construction of a modernized submersible nozzle is developed with an efficient working surface. New submersible nozzles, installed in CBCM crystallizers, make it possible to reduce steel turbulence and flow rate, and to reduce eddy formation at the l
Publikováno v:
NOVYE OGNEUPORY (NEW REFRACTORIES). :3-7
Publikováno v:
NOVYE OGNEUPORY (NEW REFRACTORIES). :5-8
The updated design of the efficient working surface for the immersion nozzle is developed in the article. The new immersion nozzles being installed in the continuous casting molds allowed to reduce the turbulence, the steel flow velocity, and the vor
Publikováno v:
NOVYE OGNEUPORY (NEW REFRACTORIES). :29-32