Zobrazeno 1 - 2
of 2
pro vyhledávání: '"Victor K Y Lo"'
Publikováno v:
HKIE Transactions. 26:20-29
This paper discusses the challenges of constructing 1.75 km of concrete sleeve pipelines with diameters of 1,200mm, 1,500mm and 2,800mm using slurry operated Tunnel Boring Machines (TBMs) for installing District Cooling System (DCS) pipelines in high
Publikováno v:
HKIE Transactions. 25:56-66
In this paper, the design and construction of 1.75 km of 1200 mm, 1500 mm and 2800 mm diameter concrete sleeve pipelines, using slurry operated tunnel boring machines (TBM), for installation of dis...