Zobrazeno 1 - 10
of 41
pro vyhledávání: '"Vick, Steven"'
Autor:
Vick, Steven
Construction progress monitoring allows schedule and/or cost deviations to be identified early enough to effectively implement corrective actions. At least 77% of transportation projects experience cost overruns, and as much as 75% of these overruns
Externí odkaz:
https://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.753414
Autor:
Li, Xiao, Wu, Chengke, Wu, Peng, Xiang, Liqun, Shen, Geoffrey Qiping, Vick, Steven, Li, Clyde Zhengdao
Publikováno v:
In Journal of Cleaner Production 1 December 2019 239
Autor:
Brilakis, Ioannis, Vick, Steven
Effective construction progress monitoring allows schedule and/or cost deviations to be identified early enough to implement corrective actions and avoid contract disputes. Current approaches are not accurate, consistent, reliable, or timely enough t
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::8e3ffda42bbe7bb6a7be0cb3b54d65b8
Publikováno v:
In Infrastructure Computer Vision 2020:203-266
Publikováno v:
In Infrastructure Computer Vision 2020:13-64
Autor:
Vick, Steven G.
The disposal of mine waste, chiefly tailings, has of late assumed an importance that transcends even the massive volumes of materials produced annually by mining operations. From an engineering standpoint, some tailings embankments class among the la
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::8f6b68202e89f149e8e0e8519916acf2
Autor:
Vick, Steven, Brilakis, Ioannis
Publikováno v:
Journal of Computing in Civil Engineering. 32
Poor performance in transportation construction is well-documented, with an estimated $114.3 billion in global annual cost overrun. Studies aimed at identifying the causes highlighted traditional project management functions like progress monitoring
Autor:
Brilakis, Ioannis, Vick, Steven
Publikováno v:
Lean and Computing in Construction Congress - Volume 1: Proceedings of the Joint Conference on Computing in Construction.
Transportation construction projects consistently underperform, with an estimated $82.6 billion globally in annual cost overruns. Current progress monitoring practices contribute to this poor performance thanks to their manual, subjective, inaccurate
Autor:
Agapaki, Eva, Akinci, Burcu, Brilakis, Ioannis, Chen, Jiawei, Haas, Carl, Kasireddy, Varun, Kim, Hyoungkwan, Kim, Minkoo, Kopsida, Marianna, Nahangi, Mohammad, German Paal, Stephanie, Tang, Pingbo, Vick, Steven, Wei, Yujie
Publikováno v:
In Infrastructure Computer Vision 2020:xiii-xiii
Publikováno v:
Journal of Geotechnical Engineering; June 1989, Vol. 115 Issue: 6 p819-835, 17p