Zobrazeno 1 - 10
of 17
pro vyhledávání: '"Veeger, C.P.L."'
Autor:
Etman, L.F.P., Veeger, C.P.L., Lefeber, A.A.J., Adan, I.J.B.F., Rooda, J.E., Jain, S., Creasey, R.R., Himmelspach, J., White, K., Fu, M.
Publikováno v:
Proceedings of the 2011 Winter Simulation Conference, 11-14 december 2011, Phoenix, Arizona, 1795-1807
STARTPAGE=1795;ENDPAGE=1807;TITLE=Proceedings of the 2011 Winter Simulation Conference, 11-14 december 2011, Phoenix, Arizona
STARTPAGE=1795;ENDPAGE=1807;TITLE=Proceedings of the 2011 Winter Simulation Conference, 11-14 december 2011, Phoenix, Arizona
Performance evaluation using queuing models is common practice in semiconductor manufacturing. Analytical closed-form expressions and simulations models are popular in capacity planning and the analysis of equipment configurations. However, the compl
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=narcis______::dacb0602e5472abb6706e7d930af7691
https://research.tue.nl/nl/publications/71d37eec-c935-47db-88c7-44c8cf1d0a1e
https://research.tue.nl/nl/publications/71d37eec-c935-47db-88c7-44c8cf1d0a1e
Autor:
Veeger, C.P.L., Etman, L.F.P., Rooda, J.E., Adan, I.J.B.F., Johansson, B., Jain, S., Montoya-Torres, J., Hugan, J., Yücesan, E.
Publikováno v:
Proceedings of the 2010 Winter Simulation Conference (Baltimore MD, USA, December 5-8, 2010), 1-12
STARTPAGE=1;ENDPAGE=12;TITLE=Proceedings of the 2010 Winter Simulation Conference (Baltimore MD, USA, December 5-8, 2010)
STARTPAGE=1;ENDPAGE=12;TITLE=Proceedings of the 2010 Winter Simulation Conference (Baltimore MD, USA, December 5-8, 2010)
On-time delivery performance of a semiconductor manufacturing system depends on the cycle time distribution of lots produced in the manufacturing network. A detailed simulation model of the manufacturing system that can predict the cycle time distrib
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=narcis______::61dd41582fc72c49dec9add2a2e7305c
https://research.tue.nl/nl/publications/cd2a82d2-4760-4b8e-a9e9-76f4ed3c93da
https://research.tue.nl/nl/publications/cd2a82d2-4760-4b8e-a9e9-76f4ed3c93da
Autor:
Veeger, C.P.L.
In modern manufacturing, model-based performance analysis is becoming increasingly important due to growing competition and high capital investments. In this PhD project, the performance of a manufacturing system is considered in the sense of through
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=narcis______::a87790af5368037970fb8ca35c4d6ff1
https://research.tue.nl/nl/publications/6a31a64b-81ce-4017-8a16-6e5ac168b2b8
https://research.tue.nl/nl/publications/6a31a64b-81ce-4017-8a16-6e5ac168b2b8
Autor:
Veeger, C.P.L., Etman, L.F.P., Rooda, J.E., van Herk, J., Rosetti, M.D., Hill, R.R., Johansson, A., Dunkin, A, Ingalls, R.G.
Publikováno v:
Proceedings of the 2009 Winter Simulation Conference (WSC 2009), 13-16 December 2009, Austin, Texas, USA, 1610-1621
STARTPAGE=1610;ENDPAGE=1621;TITLE=Proceedings of the 2009 Winter Simulation Conference (WSC 2009), 13-16 December 2009, Austin, Texas, USA
STARTPAGE=1610;ENDPAGE=1621;TITLE=Proceedings of the 2009 Winter Simulation Conference (WSC 2009), 13-16 December 2009, Austin, Texas, USA
Recently an aggregate modeling method has been developed to predict cycle time distributions as a function of throughput for manufacturing workstations with dispatching. The aggregate model is a single-server representation of the workstation with a
Publikováno v:
Proceedings of the XIV Summer School "Francesco Turco", 15-19 September 2009, Porto Giardino, Italy, IV.107-IV.115
STARTPAGE=IV.107;ENDPAGE=IV.115;TITLE=Proceedings of the XIV Summer School "Francesco Turco", 15-19 September 2009, Porto Giardino, Italy
STARTPAGE=IV.107;ENDPAGE=IV.115;TITLE=Proceedings of the XIV Summer School "Francesco Turco", 15-19 September 2009, Porto Giardino, Italy
Sustainable manufacturing includes efficient use of capital intensive manufacturing machines. For a manufacturing system to be efficiently used a trade-off has to be made between system utilization and the product flow time distribution. To be able t
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=narcis______::b3b47fbe6fefa4b5cc5ecd60ea741d6d
https://research.tue.nl/nl/publications/e1e8b3e2-e793-4b7d-9b65-e2895a92acb2
https://research.tue.nl/nl/publications/e1e8b3e2-e793-4b7d-9b65-e2895a92acb2
Predicting the cycle time distribution as a function of throughput is helpful in making a trade-off between workstation productivity and meeting due dates. To predict cycle time distributions, detailed models are almost exclusively used, which requir
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=narcis______::1989ed75ab814f71af107ce52586b325
https://research.tue.nl/nl/publications/0a9d52a9-5b60-41d2-acb6-8060074ca1ab
https://research.tue.nl/nl/publications/0a9d52a9-5b60-41d2-acb6-8060074ca1ab
Publikováno v:
Proceedings of the 7th Conference on Stochastic Models of Manufacturing and Service Operations (SMMSO 2009), June 7-12 2009, Ostuni, Italy, 38-45
STARTPAGE=38;ENDPAGE=45;TITLE=Proceedings of the 7th Conference on Stochastic Models of Manufacturing and Service Operations (SMMSO 2009), June 7-12 2009, Ostuni, Italy
STARTPAGE=38;ENDPAGE=45;TITLE=Proceedings of the 7th Conference on Stochastic Models of Manufacturing and Service Operations (SMMSO 2009), June 7-12 2009, Ostuni, Italy
For manufacturing workstations, there is a trade-o ff between throughput and meeting product due dates.Models for predicting flow time distributions are helpful in this respect. A model of a workstation typically has to include the process time distr
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=narcis______::6620a26f792a4861d16e83806602a707
https://research.tue.nl/nl/publications/8197b36b-1902-45b0-9f0d-405d70602a78
https://research.tue.nl/nl/publications/8197b36b-1902-45b0-9f0d-405d70602a78
Publikováno v:
2009 IEEE/SEMI Advanced Semiconductor Manufacturing Conference; 2009, p80-85, 6p
Publikováno v:
2008 IEEE/SEMI Advanced Semiconductor Manufacturing Conference; 2008, p127-133, 7p
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.