Zobrazeno 1 - 5
of 5
pro vyhledávání: '"V. S. Shangin"'
Publikováno v:
Power Technology and Engineering. 46:442-446
Modern procedures and structural solutions allowing for significant reduction in construction times and cost of the construction of concrete dams are examined.
Publikováno v:
Hydrotechnical Construction. 25:511-515
1. The reconstruction and repair of hydraulic developments is connected with the need for demolishing a significant volume of plain and reinforced concrete structures. 2. In the Russian and world practice, there is now a wide set of modern methods of
Autor:
M. A. Karteleva, A. I. Klebanov, A. L. Lesbekov, V. B. Sudakov, S. M. Ginzburg, A. F. Zelenin, V. S. Shangin, É. V. Kurakina
Publikováno v:
Hydrotechnical Construction. 24:509-515
1. The construction ana operation of the upstream wing wall of the Tashkumyr hydroelectric station confirmed the possibility and expediency of using lean rollcrete and simple designs for dams. After 3 years' operation the wall is in a completely sati
Publikováno v:
Hydrotechnical Construction. 14:445-449
1. Consideration of the hydrological situation in the basin of the Naryn River and the presence of the unfilled upstream reservoir of the Toktogul hydrostation made it possible to reduce the design discharge during construction at the Kurpsa site and
Publikováno v:
Hydrotechnical Construction. 7:1028-1034
1. The self-lifting cantilever formwork is a reliable and convenient type of formwork, whose basic advantages are the following: the formwork and the marquees can be lifted without using cranes, and labor time and formwork costs are reduced. 2. The u