Zobrazeno 1 - 9
of 9
pro vyhledávání: '"Utomo Dwi Hatmoko Jati"'
Publikováno v:
E3S Web of Conferences, Vol 448, p 03040 (2023)
Amidst the pressing issue of the climate crisis, the concern of housing backlog requires sustained and intensive growth in housing construction. To address this challenge while also considering environmental impacts, the Indonesian Government has pre
Externí odkaz:
https://doaj.org/article/b75add2fabd64ed2a06817a3a7b786cb
Publikováno v:
E3S Web of Conferences, Vol 202, p 09003 (2020)
One of the ways to reduce the negative impact of construction projects on the environment is reducing energy consumption. This study aims to calculate the energy consumption of a bridge construction project on the conventional beam girder and the pre
Externí odkaz:
https://doaj.org/article/6aa19ff246ac4e22bb825a516d3005c8
Autor:
Utomo Dwi Hatmoko Jati, Aditama K.A. Uda Subrata, Setiawati Apsari, Catur Adi Prasetyo Stefanus
Publikováno v:
E3S Web of Conferences, Vol 202, p 02011 (2020)
All construction activities will inevitably produce CO2 emissions from the production process of materials, transportation, the usage of plant and equipment, the construction process, up to building demolition. Therefore, it is very important to unde
Externí odkaz:
https://doaj.org/article/209bbc48c88d437e89d69e3302ea2798
Publikováno v:
MATEC Web of Conferences, Vol 270, p 05006 (2019)
The increasing need for bridge infrastructure in Indonesia requires an efficient and lean construction process. The aim of this research to evaluate the use of precast concrete elements on bridges based on the Design for Manufacture and Assembly (DfM
Externí odkaz:
https://doaj.org/article/d919a38bf19c408f819e4046dcb2244e
Autor:
Utomo Dwi Hatmoko Jati, Agung Wibowo Mochamad, Dewi Astuty Marita, Ratna Arthaningtyas Desy, Nur Sholeh Moh
Publikováno v:
MATEC Web of Conferences, Vol 270, p 05004 (2019)
Precast concrete has typically long lead time, starting from order placement, production stage, to delivery to project site, all of which requires good supply chain management. As a consequence, the risks of its supply chains are inevitable and must
Externí odkaz:
https://doaj.org/article/48cdc28a09984361ae20a4383558a750
Publikováno v:
MATEC Web of Conferences, Vol 195, p 06012 (2018)
Last Planner System (LPS) is one of Lean Construction’s tools for scheduling to enhance project’s reliability, productivity, and performance. It has already been widely adopted in many developed countries and shown benefits, such as shorter durat
Externí odkaz:
https://doaj.org/article/666d5334a41043468033bdfd54cbc51b
Publikováno v:
E3S Web of Conferences, Vol 31, p 07001 (2018)
Road infrastructure in Indonesia is mainly dominated by flexible pavement type. Its construction process, however, has raised concerns in terms of its environment impacts. This study aims to track and measure the carbon footprint of flexible pavement
Externí odkaz:
https://doaj.org/article/326487c763574c8aac67798a30195bb5
Publikováno v:
MATEC Web of Conferences, Vol 159, p 01015 (2018)
Delays may occur during pre-construction or construction phases, or both. The aim of this research is to develop a prototype of an early warning system of delay risks for public projects in pre-construction phase (EWaSDRiP). These delays are attribut
Externí odkaz:
https://doaj.org/article/64eda4da5dc14745b148d85855168e5b
Publikováno v:
Applied Mechanics and Materials; July 2016, Vol. 845 Issue: 1 p338-343, 6p