Zobrazeno 1 - 3
of 3
pro vyhledávání: '"UDC 621.165.62-192"'
Publikováno v:
Проблемы машиностроения; Том 23, № 4 (2020); 22-28
Проблеми машинобудування; Том 23, № 4 (2020); 22-28
Journal of Mechanical Engineering; Том 23, № 4 (2020); 22-28
Проблеми машинобудування; Том 23, № 4 (2020); 22-28
Journal of Mechanical Engineering; Том 23, № 4 (2020); 22-28
In the regulatory documents of the Ministry of Energy and Coal Industry of Ukraine, the beyond-design operating life of the high-energy equipment of 220 MW power units is limited to the operating life of 220 thousand hours and 800 start-ups. To date,
Publikováno v:
Проблемы машиностроения; Том 23, № 3 (2020); 8-15
Проблеми машинобудування; Том 23, № 3 (2020); 8-15
Journal of Mechanical Engineering; Том 23, № 3 (2020); 8-15
Проблеми машинобудування; Том 23, № 3 (2020); 8-15
Journal of Mechanical Engineering; Том 23, № 3 (2020); 8-15
200 MW steam turbines of DTEK Lugansk TPP units have operated for about 305–330 thousand hours with a total number of starts from 1.438 to 1,704, as of the end of 2019. The term for extending the operation of high-temperature power equipment betwee
Publikováno v:
Journal of Mechanical Engineering; Том 22, № 2 (2019); 14-20
Проблемы машиностроения; Том 22, № 2 (2019); 14-20
Проблеми машинобудування; Том 22, № 2 (2019); 14-20
Journal of Mechanical Engineering, Vol 22, Iss 2, Pp 14-20 (2019)
Проблемы машиностроения; Том 22, № 2 (2019); 14-20
Проблеми машинобудування; Том 22, № 2 (2019); 14-20
Journal of Mechanical Engineering, Vol 22, Iss 2, Pp 14-20 (2019)
To date, the fleet service life of a significant number of DTEK Energy power units is ex-ceeded. In particular, this relates to the structural components of the K-200-130-3 steam turbine of the power unit No. 9 of DTEK Luganskaya TPP. There is a need