Zobrazeno 1 - 8
of 8
pro vyhledávání: '"Tiong Iskandar"'
Publikováno v:
INFOMANPRO. 11:7-12
Tujuan Penelitian ini diharapkan dapat memberikan masukan kepada pelaku bisnis konstruksi di semua bidang dalam mengantisipasi risiko-risiko pada proyek dalam perhitungan analisa sumber daya, menyiapkan Anggaran Biaya Lapangan, dan menghindari kerugi
Publikováno v:
INFOMANPRO. 10:1-10
Strategi yang harus dilakukan kontraktor dengan keterbatasan Lingkungan kerja yang sempit yaitu membuat Cetakan Tribun di luar Area, Membuat Kerangka Atap di luar Area. Dan membuat Cetakan Kusen di luar Area. sediakan shop drawing untuk membuat keran
Publikováno v:
Civil Engineering Journal. 6:523-530
The state elementary school No.027 building construction project in Samarinda Ulu District, Samarinda City, Indonesia, in the 2019 fiscal year, which experienced delays, was allegedly due to the use of inappropriate scheduling methods. Therefore, to
Publikováno v:
Russian Journal of Agricultural and Socio-Economic Sciences, Vol 85, Iss 1, Pp 236-245 (2019)
The objectives of this research are to: 1) analyze the Labor Productivity Of Reinforced Concrete, 2) analyze difference in real labor productivity of reinforced concrete of the results of the study compared to the labor productivity of reinforced con
Publikováno v:
Russian Journal of Agricultural and Socio-Economic Sciences, Vol 85, Iss 1, Pp 436-444 (2019)
This research aims to: find out the causative factors of delay in project completion and the rank based on the perception of service providers on the causative factors of delay in project completion. It is expected that this research will be useful f
Publikováno v:
Journal of Advanced Civil and Environmental Engineering. 5:1
High-rise buildings in Indonesia must be designed resistance to receiving earthquakes. This is because the earthquake load that occurred in Indonesia has a high intensity. So that existing buildings, especially multi-story buildings must ensure good
In a construction project, we must complete the project with quality, duration, and cost as planned. Therefore, usually, we will arrange a project schedule before starting a construction project. Although the schedule has been arranged, in reality in
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::421b5af34d0797518d15e209894f395f
Badan Nasional Penanggulangan Bencana (BNPB) menyatakan sejak tahun 2002 lebih dari 50 persen bencana alam terjadi di Jawa. Kantor Staf Khusus Presiden Bidang Bantuan Sosial dan Bencana tahun 2013 menyatakan masyarakat harus tanggap bencana terhadap
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::a381f3060cb389b526ae9c9d17c9cf65
https://doi.org/10.31227/osf.io/zn2tq
https://doi.org/10.31227/osf.io/zn2tq