Zobrazeno 1 - 10
of 22
pro vyhledávání: '"Tie-Ke Li"'
Autor:
Qing LIU, Qian LIU, Jian-ping YANG, Jiang-shan ZHANG, Shan GAO, Qiang-du LI, Bao WANG, Bai-lin WANG, Tie-ke LI
Publikováno v:
工程科学学报, Vol 42, Iss 2, Pp 144-153 (2020)
Production scheduling is one of the key technologies in steel manufacturing process. It plays a significant role in reducing the production cost and improving the production efficiency of iron and steel enterprises. In recent years, with the rapid de
Externí odkaz:
https://doaj.org/article/a8e611f7a24549339bb50698ad6efaa2
Publikováno v:
2022 15th International Symposium on Computational Intelligence and Design (ISCID).
Publikováno v:
IOP Conference Series: Materials Science and Engineering. 1043:022049
Digital factory is a core technology of intelligent manufacturing, which provides a powerful guarantee for production quality, reliability and stability. For building a digital factory of complex process industry, this paper presents a product life c
Publikováno v:
Advances in Intelligent Systems and Computing ISBN: 9789811089435
This paper studies a coordinated production and distribution scheduling problem in flowshop with limited waiting times, which restricts the maximal waiting times in consecutive processing machines and between the production and distribution. This pro
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::2802484152f2efe295c56443235dbbd8
https://doi.org/10.1007/978-981-10-8944-2_116
https://doi.org/10.1007/978-981-10-8944-2_116
Publikováno v:
Applied Mechanics and Materials. :66-69
A permutation flowshop scheduling problem with maximum waiting time constraints to minimize makespan is studied, and a partheno-genetic algorithm (PGA) is presented. In PGA, the fitness function is defined as a decreasing function of makespan to enha
Publikováno v:
Advanced Materials Research. :2317-2320
Considering the feature of roller capacity with dynamics change in round bar production, a hot-rolling batch planning problem is studied. Firstly, the problem is formulated as a different capacities vehicle routing problem (DCVRP). And then, a mathem
Publikováno v:
Applied Mechanics and Materials. :1371-1374
Considering the feature of round steel enterprises with the contradiction between mass production size and the multi-variety and small-batch market demands, an order-grouping problem is studied with transportation optimization. Two objectives that to
Publikováno v:
Applied Mechanics and Materials. :1235-1238
Aiming at billet stacking problem of the rolling mill, an IBF algorithm is used to assign the billet to the warehouse positions. The utilization of non-empty warehouse positions and shuffles are considered in the algorithm. Computational experiments
Publikováno v:
Applied Mechanics and Materials. :1894-1897
The flowshop scheduling problem with limited waiting time constraints widely exists in the production process featured by high temperature and continuity. The constraints require that the waiting time of any job between two consecutive machines is no
Autor:
Tie-ke Li, Dong-liang Hou
Publikováno v:
Journal of Computer Applications. 32:3553-3557