Zobrazeno 1 - 2
of 2
pro vyhledávání: '"Thomas J. Leeson"'
Publikováno v:
All Days.
The traditional need to carry out all well operations from a rig can be expensive and delays valuable well construction programmes. Rigless intervention, including the use of subsea wireline lubricators and installing subsea Xmas trees on wire, utili
Publikováno v:
All Days.
Abstract This paper details the preparation and temporary deployment of a Multiphase Flow Meter (MPFM) for a series of multi-rate well tests carried out on high gas-liquid ratio (GLR) production wells. The MPFM incorporated specific design features t