Zobrazeno 1 - 4
of 4
pro vyhledávání: '"Thad Joseph Scott"'
Publikováno v:
All Days.
During well design and construction, the cementing of tubulars into the wellbore, referred to as primary cementation, has always been a critical step because the introduction of cement into the annulus between the tubular and open hole provides zonal
Publikováno v:
All Days.
In wells with high angles and horizontal well geometry, wireline-conveyed perforating devices have limits on their ability to be deployed into the wellbore after the final casing string has been set. In such cases, perforating devices have to be conv
Autor:
Thad Joseph Scott, Rebecca Caldwell
Publikováno v:
All Days.
Typically, the position of the top cementing plug in a subsea casing string cementing job is approximated based on the calculated casing volume, however, for various reasons, this volume often varies significantly from actual string volume, especiall
Publikováno v:
All Days.
When running casing in deepwater/subsea applications or in liner deployments, excessive surge pressure in the wellbore can occur when drilling fluid in auto-filled casing is forced through the drillpipe landing string to surface. The resulting fricti